Weve broken through at Old Oak Common — full story on Sunday #short @HS2ltd
Weve broken through at Old Oak Common — full story on Sunday #short  @HS2ltd
Uploaded November 2026 | Updated November 2026, 3 days ago
Two tunnels. 360 metres each. And not a tunnel boring machine in sight.

Our tunnellers have broken through into the Old Oak Common station box in west London, mining both tunnels using specialist excavation techniques through London Clay.

📢 Full story drops on Sunday morning. Subscribe so you don't miss it.

#HS2 #HighSpeedRail #BritishRail #Infrastructure #Jobs #Skills #Growth #BuildingBritain
Weve broken through at Old Oak Common — full story on Sunday #shortHS2 in West London: from trains to cranesHS2 lays the foundations for Birmingham’s new rail hubHS2’s Interchange Station takes step forward with bridge progressTBM Mary Ann lifted out after completing her drive #shortTrains passing under a new HS2 bridge in Birmingham #shortsHS2 marks major construction milestone at Long Itchington Wood Tunnel #shortFinal Countdown 🚄 | HS2 tunnel team prepares for final Birmingham breakthroughHS2 viaducts to be installed over busy motorwaysHear from Chris: HS2 completes UK’s heaviest bridge slide #shortHS2 Progress 🚄 | Major milestones across key 8-mile stretch of Britains new high speed railway 🏗️Northolt Tunnel progress update: 🚆 HS2 finishes excavation of 8.4 mile Northolt Tunnel in London 🏗️
HS2 Ltd |

We've broken through at Old Oak Common — full story on Sunday #short

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER