HS2 Progress 🚄 | Major milestones across key 8-mile stretch of Britains new high speed railway 🏗️ @HS2ltd
HS2 Progress 🚄 | Major milestones across key 8-mile stretch of Britains new high speed railway 🏗️  @HS2ltd
Uploaded October 2025 | Updated November 2026, 18 hours ago
In this video, we take an in-depth look at the works taking place across an eight-mile section of the HS2 route in West Northamptonshire, stretching from Greatworth through to Chipping Warden.

We’ll explore some of the key structures being delivered here that will carry high-speed trains safely through the region - including tunnels, viaducts, bridges, cuttings, and embankments.

This is a crucial section of the HS2 network, located almost halfway between the railway’s two infrastructure maintenance depots - Calvert (Buckinghamshire) and Washwood Heath (Birmingham) - and will play a vital role during trial operations of the new railway.

In this update, we focus on:

✅ The two longest green tunnels on the route – Greatworth Green Tunnel and Chipping Warden Green Tunnel.
✅ Three major viaducts – Lower Thorpe, Edgcote, and High Furlong Brook.
✅ Extensive earthworks linking the structures to create a smooth, efficient, and reliable high-speed journey.

To find out more visit: hs2.org.uk

📢 Subscribe for the latest news and updates from Britain’s high-speed railway, HS2.

Follow us on social media:
💼 X: twitter.com/HS2ltd
📸 Instagram: instagram.com/hs2ltd
📘 Facebook: facebook.com/HS2ltd
🔗 LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd

0:00 Introduction
0:35 A crucial 8-mile section of the route
1:25 Greatworth Green Tunnel – innovative ‘cut and cover’ construction
2:43 Lower Thorpe Viaduct – precision engineering over the countryside
3:39 Edgcote Viaduct – A landmark structure on the HS2 route
5:16 Chipping Warden Green Tunnel – ‘cut and cover’ in action
8:55 High Furlong Brook Viaduct – connecting key sections
9:40 Earthworks – building the foundations of HS2
10:45 Safety and Productivity – delivering HS2 efficiently in 2025
13:34 Outro – What’s next for HS2 in West Northamptonshire
0:00 Introduction – HS2 construction update in West Northamptonshire

#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering

Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
📞 Call: 08081 434 434
📧 Email: hs2enquiries@hs2.org.uk
HS2 Progress 🚄 | Major milestones across key 8-mile stretch of Britains new high speed railway 🏗️Northolt Tunnel progress update: 🚆 HS2 finishes excavation of 8.4 mile Northolt Tunnel in London 🏗️Britain gets its new longest rail bridge in major HS2 milestoneHS2 funds cycling project for boosting health and wellbeing in West LondonCGI vs Reality - HS2’s Aston Church Road Bridge edition #shortsHS2’s Old Oak Common station box excavation completeSpecialist bridge building machine constructing a high speed rail viaduct #shortsWatch as HS2 install beams for the first Interchange Station bridge #shortsExtensive earthworks on HS2’s Copthall Green TunnelTimelapse shows A452 bridge demolition by HS2 contractorsThe first beams for Birminghams new HS2 stationHS2 time-lapse: Giant box structure moved into place under A46 Kenilworth Bypass in Warwickshire
HS2 Ltd |

HS2 Progress 🚄 | Major milestones across key 8-mile stretch of Britain's new high speed railway 🏗️

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER