Uploaded October 2018 | Updated November 2026, 5 days ago
➤Don't forget to subscribe ! bit.ly/SubscribeJMSpeedshop
➤Website: jmspeedshop.com
➤instagram: instagram.com/johanmuter
finally the engine bay is ready and complete
alle the repair is done
got the inner wheel arch on the driveside repaired and coated in the noxyde coating.
also grit blasted the engine bay to remove all the little bad spots and top rust
the engine bay is first put in the primer and after this it is coated
in a JET BLACK Ral 9005 coating
next is know to put the suspension back under the car so it can go on its wheels
after this the engine and transmission needs to go in incl the diff and axles. now the exhaust is next !!
Music : MAXWELL: Ready
➤Don't forget to subscribe ! bit.ly/SubscribeJMSpeedshop
➤Website: jmspeedshop.com
➤instagram: instagram.com/johanmuter
finally the engine bay is ready and complete
alle the repair is done
got the inner wheel arch on the driveside repaired and coated in the noxyde coating.
also grit blasted the engine bay to remove all the little bad spots and top rust
the engine bay is first put in the primer and after this it is coated
in a JET BLACK Ral 9005 coating
next is know to put the suspension back under the car so it can go on its wheels
after this the engine and transmission needs to go in incl the diff and axles. now the exhaust is next !!
Music : MAXWELL: Ready










