vSite Case Study: Enhancing Bridge Replacement Projects with 3D Documentation and Data Visualization @vGISInc
vSite Case Study: Enhancing Bridge Replacement Projects with 3D Documentation and Data Visualization  @vGISInc
Uploaded January 2025 | Updated September 2026, 3 weeks ago
Warsaw Road Swing Bridge Project
Parks Canada’s Trent-Severn Waterway National Historic Site, Peterborough

Faced with aging infrastructure and complex challenges, AtkinsRéalis leveraged cutting-edge technology, including the vSite platform, to streamline construction. With real-time 3D documentation, centimeter-accurate augmented reality, and seamless integration of BIM, GIS, and point cloud data, vGIS revolutionized project efficiency and situational awareness. See how innovation and precision came together to modernize this vital piece of the Trent-Severn Waterway infrastructure.
vSite Case Study: Enhancing Bridge Replacement Projects with 3D Documentation and Data VisualizationPDF Designs Navigated as Easily as Google MapsCreating a job site sketch with augmented realityiPad 2020 Pro, iPhone 12 Pro, Samsung Galaxy Note 10+ and Google Pixel 4XL in complete darknessHigh-accuracy engineering grade augmented reality for constructionUsing AR to Find and Complete Jobsite TasksvGIS Labs: visual impact of the parallax effect on hidden objects (objects without visual anchors)Augmented reality in Construction - Case Study - Warsaw Road Swing Bridge Replacement ProjectOperating AR Hands Free with Heavy MachineryTime travel with Reality Capture and Augmented Reality ARConfirm Heavy Machinery Placement Throughout the Jobsite with vGIS ARDigital locate documentation with vSite and Radiodetection
vGIS Inc. |

vSite Case Study: Enhancing Bridge Replacement Projects with 3D Documentation and Data Visualization

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER