Augmented reality in Construction - Case Study - Warsaw Road Swing Bridge Replacement Project @vGISInc
Augmented reality in Construction - Case Study - Warsaw Road Swing Bridge Replacement Project  @vGISInc
Uploaded June 2021 | Updated September 2026, 2 weeks ago
Augmented Reality
Warsaw Road Swing Bridge Project
Parks Canada’s Trent-Severn Waterway National Historic Site, Peterborough

Atkins/SNC-Lavalin deploys an augmented reality (AR) solution at the bridge construction site commissioned by Parks Canada. This video showcases the benefits of using AR in the AEC space.

vGIS AR (https://www.vgis.io) is the leading augmented reality solution for BIM, GIS and reality capture data visualizations. vGIS was designed to create a more productive, enjoyable and safe working environment. The system connects to Esri ArcGIS, Bentley iTwin, Autodesk BIM 360, and other sources to seamlessly convert and aggregate data into powerful, accurate and stable 3D visuals. vGIS Utilities is deployed at over 100 sites across the world to bring real-life benefits to its users.

Time stamps:
0:00 - 0:19 Evaluating the job site
0:19 - 0:46 High accuracy AR for construction
0:46 - 1:01 Collaborating with visual models
1:01 - 1:22 Real-time project data visualization
1:22 - 2:19 High-accuracy 3D scans for engineers

#construction #ar #bim
Augmented reality in Construction - Case Study - Warsaw Road Swing Bridge Replacement ProjectOperating AR Hands Free with Heavy MachineryTime travel with Reality Capture and Augmented Reality ARConfirm Heavy Machinery Placement Throughout the Jobsite with vGIS ARDigital locate documentation with vSite and RadiodetectionAugmented reality for 811 excavation ticketsAdvanced Data Visualization Methods in ARSomeone Let These Turkey’s Loose in Vgis ARDeploying Structural Designs in Construction with Augmented RealityDigitalize locates with vSites Locator IntegrationDocumenting construction with engineering-grade augmented reality ARRoll Back Time and Check Site Progress with vGIS and vSite
vGIS Inc. |

Augmented reality in Construction - Case Study - Warsaw Road Swing Bridge Replacement Project

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER