Uploaded March 2019 | Updated September 2026, 2 weeks ago
We test our newest fan system at our test facility. Site in Macau is ready for installation of our new generation 4.3m (14ft) recirculation wind tunnel with 11m (36ft) tall frameless glass flight chamber. Before the technology is delivered to the client, we are doing rigorous testing to determine the flow characteristics, wind speed, noise, and other criteria. Kristians Rimkus, Head Of Engineering, takes us through the steps to ensure that the client receives a fully operational and reliable product.
Wind tunnel is a part of large scale Hotel/Shopping mall/Casino project in Macau. Opening in the end of 2019.
For more flying action follow us:
ON FACEBOOK: facebook.com/AERODIUM
ON INSTAGRAM: instagram.com/aerodium
Visit http://aerodium.technology to find out more!
We test our newest fan system at our test facility. Site in Macau is ready for installation of our new generation 4.3m (14ft) recirculation wind tunnel with 11m (36ft) tall frameless glass flight chamber. Before the technology is delivered to the client, we are doing rigorous testing to determine the flow characteristics, wind speed, noise, and other criteria. Kristians Rimkus, Head Of Engineering, takes us through the steps to ensure that the client receives a fully operational and reliable product.
Wind tunnel is a part of large scale Hotel/Shopping mall/Casino project in Macau. Opening in the end of 2019.
For more flying action follow us:
ON FACEBOOK: facebook.com/AERODIUM
ON INSTAGRAM: instagram.com/aerodium
Visit http://aerodium.technology to find out more!










