Uploaded May 2016 | Updated September 2026, 2 weeks ago
Two trains meet at Richland on the Norfolk Southern Harrisburg Line, but a motorist failed to remained stopped for the red signal and smashes through the crossing gate coming back down on the other side of the crossing. There are some closer shots of the broken gate at the end of the video.
Like us on Facebook!
facebook.com/CentralPennRailProductions
While waiting for the 94M stone train to come east with a trio of GP38 locomotives, westbound intermodal train 21M came into frame while the camera was rolling. The much anticipated 94M was struggling to make track speed on wet rail with a heavy train (they are not in full throttle for good reason) with only 6000 horse-power for a 6000-6500 ton train from the quarry at Annville. The guy in the white pick-up truck found out the hard why it is always a good idea to wait for the gates to go up completely at a double-track mainline. That was the second time in the same month that exact crossing gate was broken by a vehicle.
21M: NS Dash-9-44CW's 9497, 9317, and 9411
94M: NS GP38-2 5070 (former high-hood, new admiral cab), NS GP38-3 5827 (rebuilt GP50), and NS GP38-2 5304.
Copyright April 2016
Two trains meet at Richland on the Norfolk Southern Harrisburg Line, but a motorist failed to remained stopped for the red signal and smashes through the crossing gate coming back down on the other side of the crossing. There are some closer shots of the broken gate at the end of the video.
Like us on Facebook!
facebook.com/CentralPennRailProductions
While waiting for the 94M stone train to come east with a trio of GP38 locomotives, westbound intermodal train 21M came into frame while the camera was rolling. The much anticipated 94M was struggling to make track speed on wet rail with a heavy train (they are not in full throttle for good reason) with only 6000 horse-power for a 6000-6500 ton train from the quarry at Annville. The guy in the white pick-up truck found out the hard why it is always a good idea to wait for the gates to go up completely at a double-track mainline. That was the second time in the same month that exact crossing gate was broken by a vehicle.
21M: NS Dash-9-44CW's 9497, 9317, and 9411
94M: NS GP38-2 5070 (former high-hood, new admiral cab), NS GP38-3 5827 (rebuilt GP50), and NS GP38-2 5304.
Copyright April 2016









![Reading & Northern on the PRR Schuylkill Branch [4K]
On March 27, 2015, a train of 100 empty crude oil tank cars are bound for storage on the former Pennsylvania Railroad Schuylkill Branch between Reading and Hamburg, Pennsylvania. This was the first move of many made to store 100s of empty tank cars across the Reading & Northern system. With declining prices and demand for oil, the once busy method of shipping crude by rail between 2012-2014 has significantly dwindled. Many of these rail cars were built between 2011-2014 and have seen very few mileage, but with a lack of demand for crude by rail, thousands of these tank cars sit idle across the country, for how long? Who knows...
Like us on Facebook!
https://www.facebook.com/CentralPennRailProductions
Fan funding: The icon in the upper right corner allows you to make donations to this channel. Wed be more than thrilled by your extra support!
The power for the train, symbol PNTE (Port Clinton - Temple) had power on both end of the trains, with RBMN SD50M 5049 and GP39RN 2530 pulling the train down from Port Clinton to the Norfolk Southern interchange and BELT (Belt Line Junction) just north of the city of Reading, and RBMN SW8M 802 on the rear for the shove north toward Hamburg, which is the present day terminus of the branch and home to the Reading Company Technical & Historical Society museum and preserved railroad equipment, some of which you see scattered along the branch in this video.
The PRR Schuylkill Branch used to be a line that paralleled the Reading Railroad from Philadelphia to Delano Junction, but is now split into segments with the abandonment of most of the line. This segment runs between Laurel Junction in Temple, PA to Hamburg, PA. This section of track has not seen revenue service in many decades, and the days of the Blue Mountain & Reading steam have come and gone two decades ago. Therefore, seeing a train on the PRR side of the Schuylkill River is incredibly rare, especially on the full extent of the branch.
Hopper cars had been stored on this line in the past, but rarely north of GLEN, which is where the switch to the Glen-Gery Brick Plant and old Pennsylvania Railroad Signal bridge sit derelict. This was the first of such rare mileage empty oil can moves made, and was perhaps the first revenue freight train to run above Shoemakersville in over two decades!
Thanks for watching! Reading & Northern on the PRR Schuylkill Branch [4K]](https://i.ytimg.com/vi/vvYhj72_ilk/mqdefault.jpg)
