Titan Update: Four @ICON3DTech
Titan Update: Four  @ICON3DTech
Uploaded September 2026 | Updated November 2026, 3 hours ago
As we prepare to put Titan into the hands of other builders, this series gives you a look at our testing regimen and how we're approaching continued development of the entire print system.

In this episode, we follow Titan as it arrives on a live jobsite and is site-scanned, calibrated, and fully set up in under eight hours. A machine this capable is only as valuable as the speed at which it's ready to work, so we're showing exactly how we've thought through Titan's site arrival procedures. This demanded precise on-site scanning, tight coordination between crew and machine, and a guiding principle that Titan shouldn't slow down the jobsite it joins, it should get to work as fast as the builders who brought it there.
Titan Update: Four60+ home designs on ICON’s CODEXBuilder Intelligence Series EP 4: Inside the Titan Print SystemBuy a 3D-printed Home in TexasEl Cosmico 3D-printed Homes in Marfa, TX with Liz LambertTake a Glimpse Into ICON’s CONVERGE: Equipping The Builders of TomorrowA Next-Gen Multi-Story Robot to Change the Way We BuildMEP Rough-Ins on a 3D-Printed Home BuildLowest carbon residential building system | CarbonXICON 3D Printing for the Homeless in AustinHighlights from ICONs Technology Showcase | DOMUS EX MACHINA at SXSW 2024Efficiency and speed from site setup to the final bead
ICON |

Titan Update: Four

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER