Timelapse: International Terminal Rooftop Solar Expansion Project @brisbaneairport
Timelapse: International Terminal Rooftop Solar Expansion Project  @brisbaneairport
Uploaded March 2024 | Updated September 2026, 2 hours ago
This rooftop solar project aligns with Brisbane Airport's commitment to sustainability, emphasising renewable energy usage and expanding our existing solar energy network.

Targeting three rooftop areas in the International Terminal precinct, this project is adding an additional 5,000 solar panels to the Northern and Southern Concourse terminal rooftop and the International multi-level car park rooftop. Once installed the panels will produce 3.5GWh per year which is about 7% of the airport's total energy requirements.

🚧 Learn more about this #FutureBNE project: https://www.bne.com.au/corporate/projects/future-bne-projects/international-terminal-precinct/airport-wide-rooftop-solar
📧 Sign up to stay up-to-date on our progress as we build your Future BNE: https://www.bne.com.au/corporate/projects/future-bne-projects/future-bne-enews
Timelapse: International Terminal Rooftop Solar Expansion ProjectExplore Uluru ✈️ BNE Travel Inspo ✨Jobs @ BNE - Travel retail with Lagardère AWPLWhy will some planes need to use the New Parallel Runway while works are happening on Legacy Runway?Brisbanes Best Bites - Chefs of BNE - Paul Wackrow, The IndependentOpening Event: Direct Couriers Flagship FacilityWhats happening with the new Terminal 3 at Brisbane Airport?Major Legacy Runway Maintenance WorksProtecting Moreton BayInaugural flight arrival: American Airlines to Brisbane from Dallas-Fort Worth.BNE Community Series - Bevie Group✈️ BNE 🔁 RAR begins!
Brisbane Airport |

Timelapse: International Terminal Rooftop Solar Expansion Project

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER