Uploaded July 2012 | Updated September 2026, 3 weeks ago
Monthly test of my single phase Thunderbolt 1000T on July 18, 2012. SOMEBODY coughIancough changed the chopper pitch level in my RCM cabinet during the meetup lol. Both Alert (steady) and Attack (tornado) functions were tested. Attack signal was activated via remote to test the remote activation system.
Monthly test of my single phase Thunderbolt 1000T on July 18, 2012. SOMEBODY coughIancough changed the chopper pitch level in my RCM cabinet during the meetup lol. Both Alert (steady) and Attack (tornado) functions were tested. Attack signal was activated via remote to test the remote activation system.










