Uploaded October 2026 | Updated November 2024, 2 years ago
In Part 1 of "The Ultimate Green UPS & Power Infrastructure for Homelabs" series, we are building a DIY solar power setup to keep my homelab (and house) online during power outages while cutting down electricity bills. We will start in grid-tied mode first, with the battery installation coming in Part 2!
My homelab setup (x86 NAS, Proxmox virtualization server, 10GbE networking, surveillance PC, test servers, and multiple Raspberry Pis) draws around 300-350W continuously (~8 kWh/day, ~240 kWh/month). To keep everything running reliably during outages while cutting down power bills, we are upgrading from a traditional FSP Knight 1000VA UPS to a heavy-duty solution: the Deye 6kW Hybrid Inverter paired with six TCL 630W bifacial solar panels.
Hardware Used in this Video:
Inverter: Deye 6kW Hybrid Inverter (SUN-6K-SG06LP1-EU-CM2)
Solar Panels: 6x TCL 630W Bifacial PV Modules (HSM-ND66-GR630)
Important Configuration & Wiring Notes:
- Running Without Battery: In order to run the Deye Hybrid Inverter without a battery, you need to configure "No Battery" on the Battery setup page. Please see Section 5.6 - Battery Setup Menu on page 40 of the User Manual for more details.
- Zero Export to CT: If you haven't signed an official feed-in tariff (FIT) or electricity sales agreement with your local utility provider, remember to configure **Zero Export to CT** in the inverter settings to prevent feeding excess solar power back into the grid.
- Load vs. Grid Wiring Consideration: Since my house has a modest peak demand of around 4,000W, I routed the entire household load through the inverter's **LOAD port**, ensuring seamless 24/7 power backup during outages. However, if your household load is much higher (e.g., 10,000W or above), consider separating your circuits: connect essential devices (homelab, Wi-Fi, lights, fridge) to the **LOAD port** for continuous backup, and wire high-power appliances (water heaters, heavy electric heaters, EV chargers) to the **GRID port** (which will automatically drop during a grid outage to protect your inverter and battery).
⚠️ Electrical Safety & Compliance Notice:
Working with high-voltage DC (from solar arrays) and AC grid power carries serious safety risks. Always ensure proper frame grounding, install Surge Protection Devices (SPDs), use correctly rated cables, and double-check all connections with a multimeter before powering up. Additionally, please thoroughly research and comply with your local utility company's requirements and national regulations regarding grid-tied solar installations before connecting any system to the national grid. (This video is for educational and reference purposes only—always consult a licensed electrician if you have any doubts).
Timestamps:
00:00 - Introduction
00:24 - Homelab Setup & The Battery Backup Problem
02:39 - The Solution: Deye Hybrid Inverter SUN-6K-SG06LP1-EU-CM2
04:32 - Solar Panels Inspection & Open-Circuit Voltage Check
06:00 - Roof Mounting the TCL 630W Solar Panels
09:36 - Building the Solar Power Distribution Box (Control Box)
11:54 - Pick up the SUN-6K-SG06LP1-EU-CM2 from PowerTech
12:20 - SUN-6K-SG06LP1-EU-CM2 Installation & AC/DC Wiring
14:34 - Powering On & Initial Configuration of the inverter
15:53 - Monitor & Manage Deye Inverter with Deye Cloud application
17:35 - Brief Review of the inverter in grid-tied mode & Next action
18:33 - THANK YOU!
Related Videos & Links:
Deye 6kW Silent Unboxing Video: youtube.com/watch?v=AqZYMGxz5Ik
Deye SUN 6K SG06LP1 Product Page: deyeinverter.com/product/single-phase-low-voltage-hybrid-inverter/SUN3-3-6-4-5-6KSG06LP1EUBM1-BM2-3394.html
How to wire DC solar cable with MC4 connector: youtube.com/watch?v=kydqgauorS4
Special thanks to Deye and Chloe from the Marketing team for sponsoring the SUN-6K-SG06LP1-EU-CM2 hybrid inverter for this series. Also thanks to PowerTech for assisting with local pickup.
Thank you every one for your support. See you in the next video!
In Part 1 of "The Ultimate Green UPS & Power Infrastructure for Homelabs" series, we are building a DIY solar power setup to keep my homelab (and house) online during power outages while cutting down electricity bills. We will start in grid-tied mode first, with the battery installation coming in Part 2!
My homelab setup (x86 NAS, Proxmox virtualization server, 10GbE networking, surveillance PC, test servers, and multiple Raspberry Pis) draws around 300-350W continuously (~8 kWh/day, ~240 kWh/month). To keep everything running reliably during outages while cutting down power bills, we are upgrading from a traditional FSP Knight 1000VA UPS to a heavy-duty solution: the Deye 6kW Hybrid Inverter paired with six TCL 630W bifacial solar panels.
Hardware Used in this Video:
Inverter: Deye 6kW Hybrid Inverter (SUN-6K-SG06LP1-EU-CM2)
Solar Panels: 6x TCL 630W Bifacial PV Modules (HSM-ND66-GR630)
Important Configuration & Wiring Notes:
- Running Without Battery: In order to run the Deye Hybrid Inverter without a battery, you need to configure "No Battery" on the Battery setup page. Please see Section 5.6 - Battery Setup Menu on page 40 of the User Manual for more details.
- Zero Export to CT: If you haven't signed an official feed-in tariff (FIT) or electricity sales agreement with your local utility provider, remember to configure **Zero Export to CT** in the inverter settings to prevent feeding excess solar power back into the grid.
- Load vs. Grid Wiring Consideration: Since my house has a modest peak demand of around 4,000W, I routed the entire household load through the inverter's **LOAD port**, ensuring seamless 24/7 power backup during outages. However, if your household load is much higher (e.g., 10,000W or above), consider separating your circuits: connect essential devices (homelab, Wi-Fi, lights, fridge) to the **LOAD port** for continuous backup, and wire high-power appliances (water heaters, heavy electric heaters, EV chargers) to the **GRID port** (which will automatically drop during a grid outage to protect your inverter and battery).
⚠️ Electrical Safety & Compliance Notice:
Working with high-voltage DC (from solar arrays) and AC grid power carries serious safety risks. Always ensure proper frame grounding, install Surge Protection Devices (SPDs), use correctly rated cables, and double-check all connections with a multimeter before powering up. Additionally, please thoroughly research and comply with your local utility company's requirements and national regulations regarding grid-tied solar installations before connecting any system to the national grid. (This video is for educational and reference purposes only—always consult a licensed electrician if you have any doubts).
Timestamps:
00:00 - Introduction
00:24 - Homelab Setup & The Battery Backup Problem
02:39 - The Solution: Deye Hybrid Inverter SUN-6K-SG06LP1-EU-CM2
04:32 - Solar Panels Inspection & Open-Circuit Voltage Check
06:00 - Roof Mounting the TCL 630W Solar Panels
09:36 - Building the Solar Power Distribution Box (Control Box)
11:54 - Pick up the SUN-6K-SG06LP1-EU-CM2 from PowerTech
12:20 - SUN-6K-SG06LP1-EU-CM2 Installation & AC/DC Wiring
14:34 - Powering On & Initial Configuration of the inverter
15:53 - Monitor & Manage Deye Inverter with Deye Cloud application
17:35 - Brief Review of the inverter in grid-tied mode & Next action
18:33 - THANK YOU!
Related Videos & Links:
Deye 6kW Silent Unboxing Video: youtube.com/watch?v=AqZYMGxz5Ik
Deye SUN 6K SG06LP1 Product Page: deyeinverter.com/product/single-phase-low-voltage-hybrid-inverter/SUN3-3-6-4-5-6KSG06LP1EUBM1-BM2-3394.html
How to wire DC solar cable with MC4 connector: youtube.com/watch?v=kydqgauorS4
Special thanks to Deye and Chloe from the Marketing team for sponsoring the SUN-6K-SG06LP1-EU-CM2 hybrid inverter for this series. Also thanks to PowerTech for assisting with local pickup.
Thank you every one for your support. See you in the next video!










