Testing ramps up in the Metro Tunnel @metrotunnel
Testing ramps up in the Metro Tunnel  @metrotunnel
Uploaded April 2024 | Updated September 2026, 56 minutes ago
From signallers to engineers, it takes a team of experts to prepare the Metro Tunnel for passenger services in 2025.

Go behind the scenes at the Signal Control Centre as we run multiple test trains from West Footscray to Hawksburn via the Metro Tunnel, demonstrating the reliability of Melbourne’s new high-capacity signalling system.

About the Metro Tunnel Project

The Metro Tunnel will create a new end-to-end rail line from Sunbury in the west to Cranbourne/Pakenham in the south east, with bigger and more modern trains, and 5 new stations. With testing now underway, the Metro Tunnel will open in 2025.

Learn more:

Visit the Metro Tunnel website: https://metrotunnel.vic.gov.au
Like the Metro Tunnel on Facebook: facebook.com/metrotunnel
Follow @metrotunnelvic on Twitter: twitter.com/metrotunnelvic
Follow @metrotunnelvic on Instagram: instagram.com/metrotunnelvic
Follow @metrotunnelart on Instagram: instagram.com/metrotunnelart
Testing ramps up in the Metro TunnelEvies journey into the Metro TunnelThe Metro Tunnel Creative Program in 2023The Metro Tunnel opens on 30 NovemberCreating an underground streetThe Metro Tunnel is now openThe trains testing our next-generation signalling 🚊The first trains are now in the Metro TunnelThe transformation of Arden StationBrick by brick at City Square 🏗️Designing around iconic Melbourne landmarksState Library Station’s first ever rush hour. Captured at our recent station sneak peek.
Metro Tunnel Project |

Testing ramps up in the Metro Tunnel

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER