Some nice weather for a change!

Today was mostly moving lots of lumber around. As usual the boards I needed were on the bottom of the pile, so at least a thousand kg of wood had to be moved before I could carry the loft beam plys to the site.

Installed the center post for the ridge beam. Not cut to length yet, will do that in place later.

The structure was a bit wobbly moving around on the loft deck so I installed one sheet of outer wall sheathing to the west wall which stiffened it quite a lot.

Spent a bit of time thinking about and roughly placing the stair railing and loft balcony pony wall.
Studio Construction - Day 31 - Various PreparationsManly Beach Whole Day TimelapseStudio Construction - Day 05 - Girder Trial PlacementAdvent Calendar of Circuits 2014: Day 4: Simple RF Power MeasurementStudio Construction - Day 29 - Loft SubfloorWhistle Caduceus RocketAlans Crazy Ideas - #0 IntroStudio Construction - Day 27 - Top Plate MarkingSnooping of the Larson Scanner PWMStudio Construction - Day 04 - More Pier PoursMore Dry Pile ExperimentsStudio Construction - Day 37 - Cathedral Roof Framing
Alan Yates |

Studio Construction - Day 31 - Various Preparations

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER