Less progress today, a lot was going on elsewhere with the shop roof and the septic tank!

I did manage to repair the cart that was damaged hauling concrete and move all the 2x12 pressure treated lumber off the pallet in the drive way to exposed to 2x8s underneath. Unfortunately the pressure treated 1/2" ply was stacked on the bottom of the same pallet as the timbers for the girders and rim joists.

Level and alignment looks good, definitely worth all the careful layout and pier placement. Next step is to bolt down the girder attachments, get that 1/2" ply out and cut up the cores, insert them and laminate the girder in-place.
Studio Construction - Day 05 - Girder Trial PlacementAdvent Calendar of Circuits 2014: Day 4: Simple RF Power MeasurementStudio Construction - Day 29 - Loft SubfloorWhistle Caduceus RocketAlans Crazy Ideas - #0 IntroStudio Construction - Day 27 - Top Plate MarkingSnooping of the Larson Scanner PWMStudio Construction - Day 04 - More Pier PoursMore Dry Pile ExperimentsStudio Construction - Day 37 - Cathedral Roof FramingStrange Ultrasound Propagation ObservationDay 1: Extra Footage - Fly Swatter Measurement
Alan Yates |

Studio Construction - Day 05 - Girder Trial Placement

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER