Finished up positioning and laminating in-place the south girder. Frank and Jeff then came over and we quickly did the concrete for the last pier for the north girder.

While the concrete cured I cleaned up a bit as the GPR survey of the septic drain field is tomorrow. Tried to cut up and move most of the larger of the two trees that were felled by the shop roofing team. I'll have to chainsaw up the main trunk tomorrow.
Studio Construction - Day 07 - More Pier and Girder WorkFurby and Tribble Rock OutDay 2: Extra Footage - Coil Output in the Dark555 Super-Regenerative IF Spectrum AnalyserStudio Construction - Day 19 - Floor Insulation FinishedStudio Construction - Day 25 - East and North WallsACoC 2025: Day 10: Poisson Process Emulator (aka Geiger Counter Prop)Transmission Interferogram of Seminal Fluid2N3055 Alpha DetectorStudio Construction - Day 00 - Foundation LayoutAdvent Calendar of Circuits 2014: Day 1: High Voltage ProbeAC Ion Chamber Alpha Detector
Alan Yates |

Studio Construction - Day 07 - More Pier and Girder Work

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER