Finished up positioning and laminating in-place the south girder. Frank and Jeff then came over and we quickly did the concrete for the last pier for the north girder.
While the concrete cured I cleaned up a bit as the GPR survey of the septic drain field is tomorrow. Tried to cut up and move most of the larger of the two trees that were felled by the shop roofing team. I'll have to chainsaw up the main trunk tomorrow.