A bit easier of a day, again other work kept me from spending quality time with my girder but I eventually got all the lumber moved and the treated ply cut for the girder core. Ran out of light before finishing the lamination in-place.

Moved a bit of lumber for the other shed building too, its treated 2x8 beam plys and rim joists are now in the general location they should be. Driveway is still full of longer lumber for the studio floor that will be consumed in the next few days and we will finally be up and out of the ground and into wall framing.
Studio Construction - Day 06 - Girder LaminationThe Tapestry ElectroscopeStudio Construction - Day 14 - Floor Framing2013 Maker Faire Project Sneek-PeekAdvent Calendar of Circuits 2011: Day 4: RF Sniffer / WavemeterPaper Speaker HackBuilding Bottle Rockets for NYESimple Counting Ion ChamberBalcony Christmas LightsRainbow Lorikeet Feeding YoungWire Twisting ToolDay 23 Extra: Integrating With Other Circuits
Alan Yates |

Studio Construction - Day 06 - Girder Lamination

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER