Uploaded November 2022 | Updated November 2026, 6 hours ago
All Stremaform® formwork elements can be supplied with a rubber water bar cage for on-site installation of a rubber water bar. The Stremaform® construction joint is created according to the dimensions of the rubber water bar. This ensures the position of the water stop when it is inserted by the customer.
The water stop cage ensures stable positioning of the water stop during the entire concreting process. This provides an absolutely perfect water barrier.
MAX FRANK Group maxfrank.com
More information:
maxfrank.com/intl-en/products/formwork-technologies/02-formwork-elements-working-joints-stremaform
All Stremaform® formwork elements can be supplied with a rubber water bar cage for on-site installation of a rubber water bar. The Stremaform® construction joint is created according to the dimensions of the rubber water bar. This ensures the position of the water stop when it is inserted by the customer.
The water stop cage ensures stable positioning of the water stop during the entire concreting process. This provides an absolutely perfect water barrier.
MAX FRANK Group maxfrank.com
More information:
maxfrank.com/intl-en/products/formwork-technologies/02-formwork-elements-working-joints-stremaform










