MAX FRANK supplied specially tailored Stremaform® sections as jointing formwork between various concrete pours.
Once the tunnel tube has been installed, the track bed foundation needs to be created. This is progressed in sections via a special production line.
MAX FRANK supplied specially tailored Stremaform® sections as jointing formwork between various concrete pours.
Once the tunnel tube has been installed, the track bed foundation needs to be created. This is progressed in sections via a special production line.