As part of the "Future Railway Station Bern" project, the underground station in the existing railway station is being extended in order to optimise both the train service and the connection to the city. After completion of the tunnel, the base slab was concreted in several successive stages. Prefabricated Stremaform® elements were used to support the construction joints, which were back-anchored due to their height. This allowed the reinforcement to continue uninterrupted and provided a positive connection due to the roughness of the joint. It also meant that the lost formwork did not have to be removed, which would have slowed down the construction process. A special detail was the recess for a pump pit, which was excavated later: An elliptical Stremaform® formwork served both as a finish for the subsequent excavation work and as a frictional connection for the subsequent concreting of the pump pit walls.

More information:
_______________________________________
maxfrank.com/stremaform

Social media:
_______________________________________
Youtube: youtube.com/@MAXFRANKGroup
LinkedIn: linkedin.com/company/max-frank-group
Instagram: instagram.com/accounts/login/?next=/maxfrankgroup


Contact:
_______________________________________

Max Frank GmbH & Co. KG
Mitterweg 1
DE-94339 Leiblfing

Tel: +49 9427 189-0
info@maxfrank.de
maxfrank.com


MAX FRANK as a company:
________________________________________

We have been developing, producing and distributing a wide range of proven products for concrete and reinforced concrete construction for over half a century. We accompany our customers reliably through every building phase with a technically sophisticated and intensive intermeshing of industrial production, high-quality products and multifaceted services.

That is why we develop individual project solutions in an open dialogue with our partners. We are using innovations in structural physics geared toward longer life cycles and sustainability and we are striving to offer more efficient processes. We are assisted in this by our ability to listen attentively and ask the right questions, because good questions open up those involved in the construction to productive thinking processes and discussions beyond isolated views and prejudice. Questions that penetrate to the core of the task and help to gain new insights and stake off more and more common terrain.

We at MAX FRANK call that: BUILDING COMMON GROUND
Stremaform® as a day-joint formwork in tunnel construction for pouring concreteShearail® vs re-bar links: time challenge!So erstellst du Datenleitungen zu Rechenzentrum – dauerhaft & austauschbar!Bernhard Grindinger: Von der Baustelle ins Büro – Entwicklung zum Anwendungstechniker bei MAX FRANKSichere Fugenabdichtung zwischen Bodenplatte und KellerwandAusbildungsmesse in KronachWas ist Stremaform®? Eine einfache Erklärung mit ModellEffiziente Planung und Bemessung von geneigten Deckenplatten im Wohnbauprojekt „Futuria“ GarchingSelbststehende Abstellelemente für Arbeitsfugen in Boden- und Deckenplatten - Stremaform® A-BockSteel-to-concrete thermal break Egcobox® FBVertikale Setzungsplatte? So einfach war Hohlraum zwischen Betonwänden noch nie!Egcodorn® shear force dowel connects concrete segments of a quay wall
MAX FRANK Group |

Stremaform® as a day-joint formwork in tunnel construction for pouring concrete

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER