ST40 in operation @tokamakenergy6400
ST40 in operation  @tokamakenergy6400
Uploaded May 2018 | Updated September 2026, 2 weeks ago
See how we operate and optimise our latest device, ST40.

ST40 will demonstrate fusion temperatures, the next step in our approach to developing fusion energy.
ST40 in operationHow I got here - Lucy Scott, Control Systems Engineer, Tokamak EnergyA PhD with Tokamak EnergyInside ST40 - the worlds first high-field spherical tokamakFusion Pioneer Matt Bristow: Designing high temperature superconducting (HTS) magnetsFusion Pioneers Cary Colgan SXR DiagnosticsUpgrade work on ST40ST40 control room tourWhat is a plasma?Achieving 15 Million DegreesTokamak Energy: on a mission to deliver commercial fusionHow to Run a Tokamak: preparing and operating the ST25
Tokamak Energy |

ST40 in operation

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER