Former San Onofre nuke plant employee asks why steam generator design was changed. NRC Public Meeting on Southern California Edison's Replacement Steam Generator Failure. June 18, 2012 San Juan Capistrano, California

Question from Tim Cummings Retired Southern California Edison employee, San Onofre Unit 1: I have a question in regards to why the DESIGN was changed on the steam generators from the initial construction to where we were fabricating something..maybe different from engineering [report?] would have had you do? It seems like there's been a major deviation right there as far as steam generator design.

Greg Werner: Of course, the steam generators were different than what was originally put in because the original steam generators had to be replaced. So they had issues with the original generators across the industry and from a lessons learned standpoint the numerous changes that have been incoroporated in the new generators.
video 2012 06 18 19 30 51
SanO Nuke Plant Steam Generator Design ChangeDavid Talbot: JFK Assassination ConspiracyAntonieta Villamils Poem for Her Little Brother PedroDavid Bowie:  Five Years (1978 Tokyo)Dan Hirsch: Potential Fukushima in Los AngelesLA City Council on San Onofre Act 3 Part 1Tackling Our Petroleum Addiction - Henry SternKoretz/Rosendahl San Onofre ResolutionJose Huizar 12.14.2012Joseph White Eyes: Stand Like Standing Rock.Radiation Kills KidsUtility Companies Must Pay For Nuke Plant Mistakes
myla reson |

SanO Nuke Plant Steam Generator Design Change

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER