Uploaded September 2026 | Updated November 2026, 3 hours ago
In this video, we demonstrate the precautions before the safe isolation procedure for a three-phase distribution board, taking the process step by step and explaining why safe isolation involves much more than simply turning off the main switch.
Before beginning the practical exercise, we discuss the wider safety considerations that should already be in place, including permits to work, warning signs, barriers and appropriate procedures.
We then demonstrate how to:
⚡ Isolate individual circuits before operating the main switch
⚡ Reduce the load before switching the distribution board off
⚡ Operate the main switch off-load
⚡ Identify and use a remote means of isolation
⚡ Secure the isolation using a padlock and warning sign
⚡ Keep control of the isolation key at all times
⚡ Look for indications that equipment has actually switched off
⚡ Remove the distribution board cover with care and caution
⚡ Prepare to prove the distribution board is dead
A particularly important point for anyone preparing for their AM2 or AM2S assessment is control of the padlock key. Once you've secured the isolation, keep the key with you — don't leave it on top of the distribution board or anywhere an assessor could gain access to it.
Even when we believe the supply has been correctly isolated, we continue working cautiously when entering the electrical enclosure. Until we have correctly proved dead, we work in a manner that recognises the conductors could still be live.
🔔 Subscribe for more free electrical training videos youtube.com/c/GSHElectrical?sub_confirmation=1
👉 Next step: proving the three-phase distribution board is dead.
10 Stage of Safe Isolation youtu.be/P2VoJ52yfoE
== 🕐 Time Stamps - Cut to the action 🕕 ==
00:00 – Three-Phase Safe Isolation
00:18 – Permits, Signs & Barriers
00:35 – Isolating Individual Circuits
00:57 – Turning Off the Main Switch
01:15 – Remote Isolation Switch
01:33 – Locking Off & Warning Sign
01:51 – Keep the Padlock Key With You
02:10 – Removing the Distribution Board Cover
02:39 – Working Safely Until Proven Dead
02:55 – Ready to Prove Dead
Videos are training aids for City and Guilds (C and G) and EAL courses Level 1, 2, 3 plus AM2, AM2S and AM2E.
You can follow me day by day on Facebook, Instagram, Twitter and TikTok lookout for "GSH Electrical”.
▶️ FACEBOOK facebook.com/gshelectrical
▶️ INSTAGRAM instagram.com/p/BrIhZmrAYGDTmjMdb9lUNQodMevqsbDDki3qpQ0
▶️ TWITTER mobile.twitter.com/gsh_electrical
▶️ TikTok vm.tiktok.com/ZMRBLFdhe
#SafeIsolation #ElectricalTraining #AM2 #AM2S #Electrician #ElectricalApprentice #ThreePhase #ElectricalSafety #DistributionBoard
In this video, we demonstrate the precautions before the safe isolation procedure for a three-phase distribution board, taking the process step by step and explaining why safe isolation involves much more than simply turning off the main switch.
Before beginning the practical exercise, we discuss the wider safety considerations that should already be in place, including permits to work, warning signs, barriers and appropriate procedures.
We then demonstrate how to:
⚡ Isolate individual circuits before operating the main switch
⚡ Reduce the load before switching the distribution board off
⚡ Operate the main switch off-load
⚡ Identify and use a remote means of isolation
⚡ Secure the isolation using a padlock and warning sign
⚡ Keep control of the isolation key at all times
⚡ Look for indications that equipment has actually switched off
⚡ Remove the distribution board cover with care and caution
⚡ Prepare to prove the distribution board is dead
A particularly important point for anyone preparing for their AM2 or AM2S assessment is control of the padlock key. Once you've secured the isolation, keep the key with you — don't leave it on top of the distribution board or anywhere an assessor could gain access to it.
Even when we believe the supply has been correctly isolated, we continue working cautiously when entering the electrical enclosure. Until we have correctly proved dead, we work in a manner that recognises the conductors could still be live.
🔔 Subscribe for more free electrical training videos youtube.com/c/GSHElectrical?sub_confirmation=1
👉 Next step: proving the three-phase distribution board is dead.
10 Stage of Safe Isolation youtu.be/P2VoJ52yfoE
== 🕐 Time Stamps - Cut to the action 🕕 ==
00:00 – Three-Phase Safe Isolation
00:18 – Permits, Signs & Barriers
00:35 – Isolating Individual Circuits
00:57 – Turning Off the Main Switch
01:15 – Remote Isolation Switch
01:33 – Locking Off & Warning Sign
01:51 – Keep the Padlock Key With You
02:10 – Removing the Distribution Board Cover
02:39 – Working Safely Until Proven Dead
02:55 – Ready to Prove Dead
Videos are training aids for City and Guilds (C and G) and EAL courses Level 1, 2, 3 plus AM2, AM2S and AM2E.
You can follow me day by day on Facebook, Instagram, Twitter and TikTok lookout for "GSH Electrical”.
▶️ FACEBOOK facebook.com/gshelectrical
▶️ INSTAGRAM instagram.com/p/BrIhZmrAYGDTmjMdb9lUNQodMevqsbDDki3qpQ0
▶️ TWITTER mobile.twitter.com/gsh_electrical
▶️ TikTok vm.tiktok.com/ZMRBLFdhe
#SafeIsolation #ElectricalTraining #AM2 #AM2S #Electrician #ElectricalApprentice #ThreePhase #ElectricalSafety #DistributionBoard