Uploaded February 2021 | Updated November 2026, 4 days ago
In this video, we begin the process of planning out moving the solar feeds to our Sol-Ark. The main advantage of moving the feeders from the Outback Charge controllers is that the Sol-Ark is far more efficient than the outback controllers, plus we can also run the PV array at a higher voltage. This means we have less voltage drop back to the electrical room, and can easily utilize the same conductor for far more power!
If you are interested in purchasing a Sol-Ark inverter, please email us at info@currentconnected.com for a quote.
Visit my website at Https://www.currentconnected.com
Join the HighTechLab Discord Server! discord.gg/wZBXf4B
Introduction 0:00
Weather Damage 0:38
Broken Panel Close-up 1:01
MC4 Wiring Changes 1:50
Inside the Combiners 3:27
Opening the Wireways 5:39
Existing Main Feeds 5:59
New Wiring Plan 6:30
Outro 8:17
FTC Disclosure Statement:
Some links on this YouTube channel may be affiliate links. We may get paid if you buy something or take an action after clicking one of these.
HighTechLab is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to Amazon.com
In this video, we begin the process of planning out moving the solar feeds to our Sol-Ark. The main advantage of moving the feeders from the Outback Charge controllers is that the Sol-Ark is far more efficient than the outback controllers, plus we can also run the PV array at a higher voltage. This means we have less voltage drop back to the electrical room, and can easily utilize the same conductor for far more power!
If you are interested in purchasing a Sol-Ark inverter, please email us at info@currentconnected.com for a quote.
Visit my website at Https://www.currentconnected.com
Join the HighTechLab Discord Server! discord.gg/wZBXf4B
Introduction 0:00
Weather Damage 0:38
Broken Panel Close-up 1:01
MC4 Wiring Changes 1:50
Inside the Combiners 3:27
Opening the Wireways 5:39
Existing Main Feeds 5:59
New Wiring Plan 6:30
Outro 8:17
FTC Disclosure Statement:
Some links on this YouTube channel may be affiliate links. We may get paid if you buy something or take an action after clicking one of these.
HighTechLab is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to Amazon.com










