Raw Footage: Tunnel Boring for Evergreen Line Completed @MinistryofTranBC
Raw Footage: Tunnel Boring for Evergreen Line Completed  @MinistryofTranBC
Uploaded November 2015 | Updated November 2026, 2 hours ago
Alice, the tunnel boring machine, finished drilling a single two-kilometre tunnel, starting east of Barnet Highway in Port Moody to south of Kemsley Avenue in Coquitlam, on November 27, 2015.

The tunnel is an integral part of Evergreen Line project that will link Burnaby, Port Moody and Coquitlam to the existing SkyTrain line serving Metro Vancouver. Boring the tunnel was the most complex and technically challenging part of the Evergreen Line project.
Raw Footage: Tunnel Boring for Evergreen Line CompletedBC Road Trip Time Machine: Highway 1 - Burnaby to Pattullo Bridge, 196615 Seconds to Safety: Measuring Tire Tread DepthBC Road Trip Time Machine: Highway 97 - Penticton to Kelowna, 1966Never Pass a Plow on the RightGeorge Massey Crossing Bridge ConceptLearn How to Go Through the TELP / EIT Application ProcessHow to Install a Rolled Erosion Product360 View: Clearing Mudslide Off Portage RoadBridging Rogers Creek to Protect Port AlberniWatch and Learn How to Drive Safely in the Cone ZoneAre Your Tail Lights On?
BC Ministry of Transportation and Transit |

Raw Footage: Tunnel Boring for Evergreen Line Completed

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER