Through technical analysis and working closely with First Nations, Metro Vancouver, TransLink, municipalities and key stakeholders, the ministry has shortlisted two viable options for a future crossing: an immersed tube tunnel or long-span bridge.
In each case, the design includes six general purpose lanes plus two for transit, incorporates active transportation, protects for future rapid transit, and retains the existing tunnel for utilities.
Work to select a long-term solution for the George Massey Crossing is ongoing. It’s the ministry’s goal to complete the business case by fall 2020.
Through technical analysis and working closely with First Nations, Metro Vancouver, TransLink, municipalities and key stakeholders, the ministry has shortlisted two viable options for a future crossing: an immersed tube tunnel or long-span bridge.
In each case, the design includes six general purpose lanes plus two for transit, incorporates active transportation, protects for future rapid transit, and retains the existing tunnel for utilities.
Work to select a long-term solution for the George Massey Crossing is ongoing. It’s the ministry’s goal to complete the business case by fall 2020.