Zeitler - The new definition of pull line feeding!
EZ100 handover and introduction for Universal Elektrik in Switzerland.
Pull Line Blowing the fast way! Distance 300m pullineblowing for later fiberoptic ftth fttc fttx insertion.

The Stringing Gun EZ100 by Zeitler has been developed especially for network construction such as civil engineering, ground work, roads, tunnels, bridges, etc.

It is suitable for cable ducts from Ø 50 to 150 mm (internal diameter).

The pull line might be blown or aspirated. Water, small residues, impurities or else can often be pushed through with the shuttle in only one operation.
Blow pull line (tensile strength up to 300 kg) without compressor
For all commercial pipe work (internal diameter from 50 to 150 mm)
With special equipment also for small diameters from 25 mm
For all network construction such as civil engineering, ground work, roads, tunnels, bridges
For lengths of 1000 m and more (current record 2’850 m)
Huge time saving in cable feeding: Cleaning, taking water out, calibrating and line feeding in one step
Lightweight and compact
Excellent accessibility, even in confined spaces
Easy to handle
Double function (blowing and suction mode)
Suitable in any car boot
Value for money

Application (Short guide)

Conduit ends must be clean and cut off evenly
Firstly, blow air trough the conduit without shuttle, check if penetrable tube/correct tube
Assemble shuttle correspending exactly to the Ø int. of tube
Insert pull line through pull line supply and knot it tightly to the shuttle
Place shuttle in the conduit and press EZ100 to the conduit, the front being movable for 360°
Blow shuttle troug without interrupting
Attach either cable/s or extra strong pull line and start pulling

More Info:
https://zeitler.ch/en/products/stringing-guns/ez100

Follow us un Social Media
Facebook: facebook.com/Zeitler.AG
Instagram: instagram.com/zeitler.ag
Twitter: twitter.com/zeitler_ag
LinkedIn: linkedin.com/company/zeitler-ag
Pull Line Blowing with EZ100 handover and introduction for Universal Elektrik in SwitzerlandInstallation of Flat Drop Cable with pusher and power drillWalkaround Angacom 2017 with Zeitler AGZugschnur einblasen in Flexrohr / Wellrohr Rolle mit Schnureinblasgerät EZ.15ZEITLER AG DAY 2 ANGACOM 2017 with the EZ Booster and EZ Speedy100283EZ15 Appareil a souffler la ficelle100242 100249EZ100 Nebikon DemoEZ100 Schnureinblasgerät / SchnureinzuggerätSmallest Fiber Blowing Tool EVER  #shortsEZ15 3

Pull Line Blowing with EZ100 handover and introduction for Universal Elektrik in Switzerland @ZeitlerAG

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER