Uploaded October 2024 | Updated November 2026, 2 days ago
FULL VIDEO available on YouTube with the answer and explanation!
🔍 Scenario: The architect is designing a 3-story, 50,000 sq ft new build community health center in Salem, Oregon. The site is hilly with loose top soil and predominant wind from the east.
After schematic design has commenced, the client provides an environmental report which shows contaminated material on site, directly under the building footprint. The client decides that it is best for the material be capped and buried underground in the same location where it was found.
Provide an alternate location and orientation for the building.
FULL VIDEO available on YouTube with the answer and explanation!
🔍 Scenario: The architect is designing a 3-story, 50,000 sq ft new build community health center in Salem, Oregon. The site is hilly with loose top soil and predominant wind from the east.
After schematic design has commenced, the client provides an environmental report which shows contaminated material on site, directly under the building footprint. The client decides that it is best for the material be capped and buried underground in the same location where it was found.
Provide an alternate location and orientation for the building.










