FP McCann's standardised precast concrete structural frame is engineered offsite and delivered with certainty. It's built for data centres, logistics hubs and advanced manufacturing facilities.

Designed as a precision kit of parts, the frame scales up or down in footprint and storey height to suit your site. Heavy-duty columns and beams, precast stair cores, precast stairs and prestressed hollowcore floors give immediate structural stability, with early, safe floor-to-floor access and no wet trades.

Key facts:
▶ 20 kN/m² floor loadings as standard
▶ 2-hour structural fire rating as standard
▶ Full load-takedown calculations supplied at tender
▶ 12-week standard lead time
▶ 400 m² of suspended floor plate erected per week with a single crane, faster with multiple cranes
▶ Approximately £600/m², inclusive of cores, columns, beams, floors and toppings

Precast vs in-situ concrete and steel:
✔ Faster build programmes and lower costs
✔ Fewer on-site trades and factory-quality finishes
✔ No weather delays
✔ Inherent fire resistance, so no extra fire protection work as with steel

Insulated sandwich panels and facades:
FP McCann's precast insulated sandwich panels combine a structural inner leaf, a continuous insulation core and an external facade in one unit. They eliminate thermal bridging, cut running costs and provide over 50 dB of acoustic attenuation. Finishes range from utilitarian factory finishes to cast-in brick slips, acid-etched reconstituted stone and bespoke 3D pattern moulds. The frame can also receive third-party lightweight rainscreen systems.

Panels can arrive with cast-in electrical conduits, ventilation routes and plumbing pathways, plus pre-installed windows and doors. The robust concrete envelope helps protect against accidental damage, forced entry and vehicle ramming.

Chapters:
0:00 Introduction
0:25 Precast vs in-situ concrete and steel
0:46 FP McCann's standardised precast frame
1:10 Columns, beams and precast stairs
1:25 20 kN/m² loading and 2-hour fire rating
1:43 Load-takedown calculations at tender
1:51 12-week lead time and 400 m²/week erection
2:08 Installation sequence
2:38 Insulated sandwich panels
2:59 Facade finishes
3:23 Cast-in services, windows and doors
3:31 Security and impact resistance
3:46 Cost clarity from your PCSA
4:01 Contact our structural frame team

Speak to our structural frame team about your next PCSA:

GB – Ryan Millican
📧 RMillican@fpmccann.co.uk
📞 +44 1335 362846

Ireland – Clayton Lawrence
📧 Clayton.Lawrence@fpmccann.co.uk
📞 +44 28 7954 9178

🔗 fpmccann.co.uk/precast-structural-solutions
🔗 Read the news story: fpmccann.co.uk/portfolio-items/precast-concrete-frame-data-centres-video

#PrecastConcrete #DataCentres #OffsiteConstruction
Precast Concrete Frames for Data Centres & Logistics | FP McCannFP McCann Plastic Pipes – Coming Soon | New Multi-Load Civils Range for MerchantsFP McCann StormBrake™ - Vortex Flow ControlFP McCann mark key stage of Bay Road Project with installation of the Pennyburn BridgeFP McCann Poole Precast Multi-Storey Car ParkFP McCann Wakefield Precast Multi-Storey Car Park2011-11-15 Resurfacing of Kirkistown Race TrackFP McCann - BIM Development Dock ModelFP McCann Walsall Tank InstallationHow to mix FP McCanns Roof Tile Bedding MortarBlackhead Coastal Path Project Update September 2019FP McCann Vortex Flow Control Device - StormBrake™️
FP McCann |

Precast Concrete Frames for Data Centres & Logistics | FP McCann

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER