FP McCann mark key stage of Bay Road Project with installation of the Pennyburn Bridge @FPMcCann1
FP McCann mark key stage of Bay Road Project with installation of the Pennyburn Bridge  @FPMcCann1
Uploaded February 2024 | Updated September 2026, 2 weeks ago
This key stage in the project saw the lifting into place of the 63m long and 4m wide Pennyburn foot and cycle bridge, that now connects the new 650m shared pedestrian and cyclist Greenway that runs along the banks of the River Foyle to connect with the existing path network in Bay Road Park. The project has been funded by the INTERREG VA Programme, administered by the Special EU Programmes Body and the Department for Communities, and is scheduled to open to the public later in the Spring.

For further information on the project, visit fpmccann.co.uk/portfolio-items/fp-mccann-appointed-to-deliver-strabane-north-greenway-project
FP McCann mark key stage of Bay Road Project with installation of the Pennyburn BridgeFP McCann Poole Precast Multi-Storey Car ParkFP McCann Wakefield Precast Multi-Storey Car Park2011-11-15 Resurfacing of Kirkistown Race TrackFP McCann - BIM Development Dock ModelFP McCann Walsall Tank InstallationHow to mix FP McCanns Roof Tile Bedding MortarBlackhead Coastal Path Project Update September 2019FP McCann Vortex Flow Control Device - StormBrake™️FP McCanns Precast Architectural Cladding Used at Woodberry Down Development in London.FP McCann-BAM Construction Bridge Beam Installation at A31 Magherafelt BypassIntroducing the FP McCann Roofing Sales Team
FP McCann |

FP McCann mark key stage of Bay Road Project with installation of the Pennyburn Bridge

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER