Nemesis 2nd new home testing @coasterinc1987
Nemesis 2nd new home testing  @coasterinc1987
Uploaded July 2011 | Updated September 2026, 6 hours ago
nemesis has now moved again, its in the other conservatory on a brand new much stronger table to prevent bending and flexing... most of the painting work has been done, more had been done till issues came up with the track which has been replaced... atm its not quiet working as not all of the joins have been smoothed, the lift hill is playing up with the joins in the springs not letting the car pass even though they used to...

the 1st run shows how far the train gets under its own power from the top, the 2nd is with a push... after the loop none of the joins have been sorted which is why it doesnt get round and the brake run isnt railed...

in the mids of trying to sort out replacement spring and alter the brake run section however coaster dynamix are charging a fortune for the bits i want... ($38 for 2 springs and a length of track, then $41 for shipping alone!)
Nemesis 2nd new home testingnemesis model 2nd testingProject Towers - Smiler UpdateProject Nem 20 TeaserProject Nem 20No Limits to RCT3 CT Revised Full Tutorial Part 7 - XML Part 1skyride testProject Nem 20 Early Preview...No Limits to RCT3 CT Revised Full Tutorial Part 3 - Sketchup to BlenderTeaser Trailer Release Date AnnouncmentProject Towers Current Progress Overview  500 SUBSCRIBER SPECIAL!Nemesis Model Test 4
coasterinc |

Nemesis 2nd new home testing

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER