Uploaded June 2026 | Updated November 2026, 4 days ago
Mammoet was approached by Qingdao McDermott Wuchuan (QMW) to perform the weighing, jacking and load-out of the 33,000t floating production unit for Woodside Energy’s Scarborough Project at its fabrication yard in China.
The solution included an integrated weighing and jacking solution and fabrication of a specialist starter beam that between them brought significant time and cost-saving benefits to the project.
Read the case study:
mmoet.me/3R8zqI8
#mammoet #skidding #jacking #engineering #loadout
Mammoet was approached by Qingdao McDermott Wuchuan (QMW) to perform the weighing, jacking and load-out of the 33,000t floating production unit for Woodside Energy’s Scarborough Project at its fabrication yard in China.
The solution included an integrated weighing and jacking solution and fabrication of a specialist starter beam that between them brought significant time and cost-saving benefits to the project.
Read the case study:
mmoet.me/3R8zqI8
#mammoet #skidding #jacking #engineering #loadout










