...to the Oostertoegang side of Amsterdam Centraal station on a flat-top barge, partially submerged so that it could pass underneath a low footbridge.

Once in position, the sections were rotated 90 degrees, using SPMT, before being jacked up using specialist lifting equipment.

Watch it all take place in episode three!

🛤️: ProRail
🏗️: Dura Vermeer
🛠️: Hollandia Infra

#Mammoet #Civil #Rail
Each bridge section was delivered...The sheer SIZE of offshore wind foundationsDelivering sustainable energy, sustainably!At Amsterdam Centraal station, in the center...Holland Hydrogen 1 Episode 1Lifting hundreds of tonnes from a TINY footprintMammoets transport of Kiruna church ...Two monopile handling innovations...Taking a church for a walk...Holland Hydrogen 1 Episode 4Mammoet @ NEXUS Leiden #2🏆 YouTubes Mammoet Moment of 2025 Winner: Greater Changhua 2b and 4 offshore wind farms! 🏆
Mammoet |

Each bridge section was delivered...

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER