Uploaded October 2025 | Updated September 2026, 3 weeks ago
Now that I have finally built the Walthers background flat kits, it's finally time to install the track leading down to the industries along the back of the layout. While installing track and turnouts is a fairly easy task once you've done a few, it still can be time consuming since it requires a stepwise approach and time for adhesive to dry before you can move from step to step. Consequently, this will be a 2 part video, but I promise that part 2 will follow next week. By the way here’s the name for those red rubber caps I got off Amazon: “Zonon 35 Pieces Caulk Cap Caulk Saver Finishing Tool Tube Covers Tube Caps for Sealing and Preserving, Red”.
Now that I have finally built the Walthers background flat kits, it's finally time to install the track leading down to the industries along the back of the layout. While installing track and turnouts is a fairly easy task once you've done a few, it still can be time consuming since it requires a stepwise approach and time for adhesive to dry before you can move from step to step. Consequently, this will be a 2 part video, but I promise that part 2 will follow next week. By the way here’s the name for those red rubber caps I got off Amazon: “Zonon 35 Pieces Caulk Cap Caulk Saver Finishing Tool Tube Covers Tube Caps for Sealing and Preserving, Red”.










