Madison College - ECHO USA, Inc. capstone project, Fuel Cap Assembly @PSDettmer
Madison College - ECHO USA, Inc. capstone project, Fuel Cap Assembly  @PSDettmer
Uploaded March 2020 | Updated September 2026, 3 weeks ago
Madison Area Technical College AMST program students demonstrate their capstone project for ECHO USA, Inc.. The assembly process includes loading a fuel cap, inserting a seal, installing a plastic retainer, and inspecting the finished assembly.
All of the fixtures, tooling, PLC, Robot, & HMI programming was completed by students (Philip M. & Travis K.). Thanks to our supporters and sponsors at YAMAHA, FANUC Robotics, & COGNEX.
Madison College - ECHO USA, Inc. capstone project, Fuel Cap AssemblyMadison College - MPI Products, Inc. capstone project, Part Handling05 Milling Machine Fab TutorialFirmware upgrade on ControlLogix L73 processorThe CALL instruction on FANUC TPP and running in AUTOFREE PLC Programming Software with SimulatorMS Project Assignment Week 10 - 2018Configuring a new Project in RSLogix5000 via RSLinx Serial driverAccessing MicroLogix1100 PLC via Ethernet IPFrames in Robotics - Tool frames (UTOOL)Intro to Machine Vision and Robotics - part 2How to configure a Produce and Consume Tag in RSLogix5000
Robotics & Automation - Electro-Mechanical |

Madison College - ECHO USA, Inc. capstone project, Fuel Cap Assembly

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER