Uploaded August 2026 | Updated November 2026, 3 days ago
The first activation is shown at 3:45
Filmed with youtube.com/@UCTBnAtp7X7oDWmpjbpZuLfQ
This is the Mallee Highway level crossing west of Ouyen VIC, located on the Murrayville line.
These signals were installed on October 14, 1982. The eastern signal has a sticker stating that it was manufactured by Galvanizing Industries in Melbourne, while both western signals have unmarked bases.
There is an unusually tall signal on the western side to improve visibility, due to an uphill bend in the road approaching the crossing.
The first activation is shown at 3:45
Filmed with youtube.com/@UCTBnAtp7X7oDWmpjbpZuLfQ
This is the Mallee Highway level crossing west of Ouyen VIC, located on the Murrayville line.
These signals were installed on October 14, 1982. The eastern signal has a sticker stating that it was manufactured by Galvanizing Industries in Melbourne, while both western signals have unmarked bases.
There is an unusually tall signal on the western side to improve visibility, due to an uphill bend in the road approaching the crossing.










