Uploaded December 2019 | Updated November 2026, 40 minutes ago
A closer look at the original signals can be seen here youtube.com/watch?v=NyzKAbk2gQM&t=2s
This is the Shepherds Siding Road level crossing between Junee and Wagga Wagga, on the ARTC Sydney - Melbourne line. The crossing was upgraded with new signals during late May 2019 which sees the end of the Harmon gate mechanisms here, leaving Sladen Street, Henty as the last crossing in New South Wales (and most likely Australia) to have Harmon mechs.
Both new signals have Western Cullen Hayes bases, Western Cullen Hayes gate mechanisms, Western Cullen Hayes lights with Aldridge LED's and Western Cullen Hayes electronic bells. A slight change to the bell operation is that both new bells ring from start-up until the gates rise, differing from the old signals where the southern mechanical bell would only ring until the gates had lowered.
One pleasing piece of news is that the Western Cullen Hayes mechanical bell from the old northern signal (silo side of crossing) has since been reused on the crossing at Sladen Street, Henty to replace the dying m-bell bell there.
Train information:
1st train: 4WM2 steel from Port Kembla to Melbourne, with locomotives NR39, LDP8 and LDP6. Filmed on May 15, 2019.
2nd train: 5WM2 steel from Port Kembla to Melbourne, with locomotives NR62, TT110 and LDP7. Filmed on December 12, 2019.
A closer look at the original signals can be seen here youtube.com/watch?v=NyzKAbk2gQM&t=2s
This is the Shepherds Siding Road level crossing between Junee and Wagga Wagga, on the ARTC Sydney - Melbourne line. The crossing was upgraded with new signals during late May 2019 which sees the end of the Harmon gate mechanisms here, leaving Sladen Street, Henty as the last crossing in New South Wales (and most likely Australia) to have Harmon mechs.
Both new signals have Western Cullen Hayes bases, Western Cullen Hayes gate mechanisms, Western Cullen Hayes lights with Aldridge LED's and Western Cullen Hayes electronic bells. A slight change to the bell operation is that both new bells ring from start-up until the gates rise, differing from the old signals where the southern mechanical bell would only ring until the gates had lowered.
One pleasing piece of news is that the Western Cullen Hayes mechanical bell from the old northern signal (silo side of crossing) has since been reused on the crossing at Sladen Street, Henty to replace the dying m-bell bell there.
Train information:
1st train: 4WM2 steel from Port Kembla to Melbourne, with locomotives NR39, LDP8 and LDP6. Filmed on May 15, 2019.
2nd train: 5WM2 steel from Port Kembla to Melbourne, with locomotives NR62, TT110 and LDP7. Filmed on December 12, 2019.