Leslie Dan: Overview of Staging Area on Site @tboake3000
Leslie Dan: Overview of Staging Area on Site  @tboake3000
Uploaded February 2013 | Updated September 2026, 3 weeks ago
Construction of the Leslie Dan School of Pharmacy at the University of Toronto, designed by Foster+Partners. This video shows the staging area as well as the 50 tonne truss prior to being lifted.
Leslie Dan: Overview of Staging Area on SiteArch 671 - Cladding ExamplesLeslie Dan: Moving the Flying Concrete Floor FormsArchitecturally Exposed Structural Steel - TENSIONArch 570 - Force Differentiated Steel StructuresArch 570: AESS and Glazing SystemsArch 570 - AESS Tension StructuresSteel and Timber ConstructionArchitecturally Exposed Structural Steel - Part 3 - ConnectionsLeslie Dan: Lifting the Steel Beam with the CraneLeslie Dan: Prepping the Stub to Receive the Incoming BeamLeslie Dan: Installation of Decking
Terri Boake |

Leslie Dan: Overview of Staging Area on Site

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER