Leslie Dan: Prepping the Stub to Receive the Incoming Beam @tboake3000
Leslie Dan: Prepping the Stub to Receive the Incoming Beam  @tboake3000
Uploaded February 2013 | Updated September 2026, 1 week ago
Construction of the Leslie Dan School of Pharmacy at the University of Toronto, designed by Foster+Partners. This video shows the preparation of the stub beam to receive the incoming larger member. The ironwork prepares the bolts.
Leslie Dan: Prepping the Stub to Receive the Incoming BeamLeslie Dan: Installation of DeckingArch 173: Steel ConstructionArch 172: Stone Construction: From Technique to TechnologyAE101: From High Tech to Architecturally Exposed Structural Steel 2019Arch 125: Building Science Part 1Solar ShadingOCAD Installation of Spray FireproofingAE101: Developments in Concrete ConstructionArch 570 - Architectural Steel - SPANSteel Construction LectureReinforced Concrete Construction Lecture
Terri Boake |

Leslie Dan: Prepping the Stub to Receive the Incoming Beam

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER