Other exceptionally large tools designed for ITER include a lifting beam system. This system will install ITER’s heaviest part, the base of the cryostat, weighing 1,250 metric tons. This handling system comprises four beams, two of them fitted with hydraulic rams which will balance the load. It handles the cryostat base and positions it in the pit.

More information : cnim.com/en/positioning-parts-weighing-hundreds-metric-tons-accuracy-within-110th-millimeter
ITER: 4 Lifting Beam systems TestedManufacture and installation of the RJH block batteryLaveurs marins : lancement dun business à fort potentielLarge dimension, high performance composite and polyurethane equipmentCNIM Film Clip 2019 (French version)Compact Linear Fresnel Reflector technology by CNIM - Concentrating solar power plantCNIM, manufacturer and integrator of proven innovative naval equipmentCNIM L-CAT® Shore-to-Shore - Regional Force Projection CraftITER Cryostat Base InstallationVID 20191001 173631Bridging system: CNIM PTA Modular Assault BridgeSHARJAH
CNIM Groupe |

ITER: 4 Lifting Beam systems Tested

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER