ITER Cryostat Base Installation @GroupeCNIM
ITER Cryostat Base Installation  @GroupeCNIM
Uploaded May 2020 | Updated September 2026, 3 hours ago
Handling of the cryostat base, the heaviest of all the ITER machine components with its 1250 tons and 30-meters diameter, was complex. From the entrance to the assembly building to its final position, the cryostat had to be lifted above the 2 SSATs* and then slowly lowered into the pit. Precise balance was the challenge of this operation.

More information :
ITER Cryostat Base InstallationVID 20191001 173631Bridging system: CNIM PTA Modular Assault BridgeSHARJAHITER : 4 palonniers testésMajor Quentins testimony on PFMs upgraded performancesLAB - Integrated solutions to reduce emissionsWindkeeper 3D presentationLhistoire de CNIMInstrumentation haute performance pour les diagnostics plasmaL-CAT® - 2 ships in 1 -The High Speed Sea Connector for Amphibious OperationsHigh performance nuclear systems by CNIM Systèmes Industriels
CNIM Groupe |

ITER Cryostat Base Installation

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER