This video shows the demolition of a factory building simulated with our Bullet Constraints Builder software for Blender. The structural model is generated automatically by the BCB software which is developed as part of the INACHUS research project.
The second INACHUS field test was held on 31 May 2017 in Lyon, France. It focused on merging data from wide area assessment tools and collapse simulations. In collaboration with CARDEM, a French demolition company, INACHUS partners identified a three-story factory building in Saint-Fons that was scheduled to be demolished. The first scenario planned was to weaken key pillars and subsequently pull the building over by ropes which is what we simulated here.
The INACHUS project is a European wide research project starting in 2015, that examines measures to improve first response after building collapse in catastrophic events like earthquakes, storms, explosions etc.
"INACHUS" stands for:
Technological & Methodological Solutions for Integrated Wide Area Situation Awareness & Survivor Localization to Support Search & Rescue Teams
Credits & Links:
INACHUS - H2020, InvestEUresearch, EU-funded research, science
http://www.inachus.eu
Laurea University of Applied Sciences LUAS, Finland
Kai Kostack, Oliver Walter, Seija Tiainen
inachuslaurea.files.wordpress.com
3D-Software: blender.org
Bullet Constraints Builder: github.com/KaiKostack/bullet-constraints-builder
Simulated with Fracture Modifier build for better performance: blenderartists.org/forum/showthread.php?343637-Custom-Build-Blender-Fracture-Modifier
This video shows the demolition of a factory building simulated with our Bullet Constraints Builder software for Blender. The structural model is generated automatically by the BCB software which is developed as part of the INACHUS research project.
The second INACHUS field test was held on 31 May 2017 in Lyon, France. It focused on merging data from wide area assessment tools and collapse simulations. In collaboration with CARDEM, a French demolition company, INACHUS partners identified a three-story factory building in Saint-Fons that was scheduled to be demolished. The first scenario planned was to weaken key pillars and subsequently pull the building over by ropes which is what we simulated here.
The INACHUS project is a European wide research project starting in 2015, that examines measures to improve first response after building collapse in catastrophic events like earthquakes, storms, explosions etc.
"INACHUS" stands for:
Technological & Methodological Solutions for Integrated Wide Area Situation Awareness & Survivor Localization to Support Search & Rescue Teams
Credits & Links:
INACHUS - H2020, InvestEUresearch, EU-funded research, science
http://www.inachus.eu
Laurea University of Applied Sciences LUAS, Finland
Kai Kostack, Oliver Walter, Seija Tiainen
inachuslaurea.files.wordpress.com
3D-Software: blender.org
Bullet Constraints Builder: github.com/KaiKostack/bullet-constraints-builder
Simulated with Fracture Modifier build for better performance: blenderartists.org/forum/showthread.php?343637-Custom-Build-Blender-Fracture-Modifier








![WTC Simulation 2.0 Announcement [8K]
To improve building designs you need to understand their behavior. 10 years ago there was a first simulation attempt of the top of the north tower uploaded to this channel. 6 years ago this led to the opportunity to develop a new software for structural simulation within a scientific environment. And now is a good time to put the Bullet Constraints Builder to the ultimate test... Stay tuned!
https://inachuslaurea.wordpress.com WTC Simulation 2.0 Announcement [8K]](https://i.ytimg.com/vi/WbsQrsN3mIU/mqdefault.jpg)