Uploaded October 2026 | Updated November 2026, 3 days ago
gcexperts.com/zoom?utm_source=youtube&utm_medium=promo&utm_campaign=promo
In this clip from a 2013 workshop recording, the speaker walks through a bidding hypothetical. The drawings and the specs contradict each other: one says to paint the room, the other says not to. The speaker explains that this kind of conflict is a patent ambiguity, and that a contractor has a duty to ask the government before bidding. If you don't ask, the ambiguity becomes your problem and your risk on the job.
gcexperts.com/zoom?utm_source=youtube&utm_medium=promo&utm_campaign=promo
In this clip from a 2013 workshop recording, the speaker walks through a bidding hypothetical. The drawings and the specs contradict each other: one says to paint the room, the other says not to. The speaker explains that this kind of conflict is a patent ambiguity, and that a contractor has a duty to ask the government before bidding. If you don't ask, the ambiguity becomes your problem and your risk on the job.










