The 2nd Empire Strikes Back | I Built a Victorian Bench (1/2 Day DIY Cast Iron Bench RESTORATION) @The2ndEmpireStrikesBack | Uploaded July 2022 | Updated October 2024, 1 day ago.
50% off your first order (plus free shipping!) when you order through my link today cometeer.com/secondempire.
Kim and I recently visited a local antique store and came across a pair of Victorian cast iron bench pieces. We made them ours, took them home, cleaned them up, and put them back into service using a bit of oak we salvaged from the church pews. It was a quick 1/2 day project and it was an excellent break from the heat outside. I hope you enjoy our little journey in restoring this cute little Victorian bench.
Help support our vision by grabbing yourself a custom quality hoodie: the2ndempirestrikesback.junipercreates.com/channel/UCuteYo4Kgm1t1DqkUV33BcQ/p/7227900100799
Patreon: patreon.com/thesecondempirestrikesback
Our 2nd Channel: youtube.com/channel/UCvyfozDsB8VVQyVs66Pu9ng
Instagram: instagram.com/the_2nd_empire_strikes_back
Tiktok: tiktok.com/@the2ndempirestrikesback
#DIY #Antiques #Victorian #Restoration
Theme music by: Cameron Bradbrook
soundcloud.com/cameron-bradbrook
bradbrookmusic@gmail.com
For Business Inquiries please email us at the2ndempirestrikesback@gmail.com
If you'd like to send us a letter or package please send it here:
The 2nd Empire Strikes Back
PO Box 2601
St Louis, MO 63116
Campbell House: campbellhousemuseum.org
Magic Chef Mansion: magicchefmansion.com
^^^Seriously if you visit St. Louis and love all things Victorian go here^^^
Completed Projects (2021): New Roof, New Water Service, New Windows (Partial), Boiler Work, Sewer Lateral, Tuckpointing, Plaster Repair (Partial), Wood Floors (Partial), Electric Service (Partial)
Projects to Complete in 2022: Limestone Restoration of Front Elevation, Rebuild Mansard, New Windows (Partial), Complete Plaster Work (2nd Floor and Back Hallway 1st Floor, Kitchen and Dining Room), Plumbing Stacks and Rough in Plumbing, Complete Electric, HVAC (Basement and 1st Floor), High Velocity AC and Heat (2nd Floor), Mini Splits (3rd Floor), Framing on 3rd Floor, Rebuild of Front Cornice Work and Copper Gutter System, Rebuilding of Dormers
50% off your first order (plus free shipping!) when you order through my link today cometeer.com/secondempire.
Kim and I recently visited a local antique store and came across a pair of Victorian cast iron bench pieces. We made them ours, took them home, cleaned them up, and put them back into service using a bit of oak we salvaged from the church pews. It was a quick 1/2 day project and it was an excellent break from the heat outside. I hope you enjoy our little journey in restoring this cute little Victorian bench.
Help support our vision by grabbing yourself a custom quality hoodie: the2ndempirestrikesback.junipercreates.com/channel/UCuteYo4Kgm1t1DqkUV33BcQ/p/7227900100799
Patreon: patreon.com/thesecondempirestrikesback
Our 2nd Channel: youtube.com/channel/UCvyfozDsB8VVQyVs66Pu9ng
Instagram: instagram.com/the_2nd_empire_strikes_back
Tiktok: tiktok.com/@the2ndempirestrikesback
#DIY #Antiques #Victorian #Restoration
Theme music by: Cameron Bradbrook
soundcloud.com/cameron-bradbrook
bradbrookmusic@gmail.com
For Business Inquiries please email us at the2ndempirestrikesback@gmail.com
If you'd like to send us a letter or package please send it here:
The 2nd Empire Strikes Back
PO Box 2601
St Louis, MO 63116
Campbell House: campbellhousemuseum.org
Magic Chef Mansion: magicchefmansion.com
^^^Seriously if you visit St. Louis and love all things Victorian go here^^^
Completed Projects (2021): New Roof, New Water Service, New Windows (Partial), Boiler Work, Sewer Lateral, Tuckpointing, Plaster Repair (Partial), Wood Floors (Partial), Electric Service (Partial)
Projects to Complete in 2022: Limestone Restoration of Front Elevation, Rebuild Mansard, New Windows (Partial), Complete Plaster Work (2nd Floor and Back Hallway 1st Floor, Kitchen and Dining Room), Plumbing Stacks and Rough in Plumbing, Complete Electric, HVAC (Basement and 1st Floor), High Velocity AC and Heat (2nd Floor), Mini Splits (3rd Floor), Framing on 3rd Floor, Rebuild of Front Cornice Work and Copper Gutter System, Rebuilding of Dormers