The 2nd Empire Strikes Back | Did I WASTE money by buying this? - Abandoned Victorian Mansion EP 45 @The2ndEmpireStrikesBack | Uploaded November 2021 | Updated October 2024, 1 day ago.
Save 50% or more on your SimpliSafe security system during
their biggest sale of the year! Visit
SimpliSafe.com/thesecondempirestrikesback to learn more!
This week was a little bit all over the place, but we finally have the boom lift. Which will be a huge help in the future especially come spring. A few new lines of electrical were added. We also got some more amazing items from you guys the community. All in all another good week.
#Victorian #Restoration #Lift
Hall and Brown/SESB Merch: teespring.com/stores/the-2nd-empire-strikes-back
Kim's Channel: youtube.com/channel/UCvyfozDsB8VVQyVs66Pu9ng
Patreon: patreon.com/thesecondempirestrikesback
Instagram: instagram.com/the_2nd_empire_strikes_back
Tiktok: tiktok.com/@the2ndempirestrikesback
For Business Inquiries please email us at the2ndempirestrikesback@gmail.com
P.O. Box
The 2nd Empire Strikes Back
PO Box 2601
St Louis, MO 63116
Campbell House: campbellhousemuseum.org
^^^Seriously if you visit St. Louis and love all things Victorian go here^^^
Music: bensound.com/royalty-free-music
Completed Projects (2021): New Roof, New Water Service, New Windows (Partial), Boiler Work, Sewer Lateral, Tuckpointing, Plaster Repair (Partial), Wood Floors (Partial), Electric Service (Partial)
Projects to Complete in 2022: Limestone Restoration of Front Elevation, Rebuild Mansard, New Windows (Partial), Complete Plaster Work (2nd Floor and Back Hallway 1st Floor, Kitchen and Dining Room), Plumbing Stacks and Rough in Plumbing, Complete Electric, HVAC (Basement and 1st Floor), High Velocity AC and Heat (2nd Floor), Mini Splits (3rd Floor), Framing on 3rd Floor, Rebuild of Front Cornice Work and Copper Gutter System, Rebuilding of Dormers
Projects to Complete in 2023: Hallways and Stairwells (Plaster Repair, Floors, Stringers of Stairwell Reinforment), Completion of Windows (1st and 3rd Floors), Parlors (Including Fireplace Mantels, and Pocket Doors, and Decorative Fretwork, Completion of 3 Floor Bathroom and Main Suite
Save 50% or more on your SimpliSafe security system during
their biggest sale of the year! Visit
SimpliSafe.com/thesecondempirestrikesback to learn more!
This week was a little bit all over the place, but we finally have the boom lift. Which will be a huge help in the future especially come spring. A few new lines of electrical were added. We also got some more amazing items from you guys the community. All in all another good week.
#Victorian #Restoration #Lift
Hall and Brown/SESB Merch: teespring.com/stores/the-2nd-empire-strikes-back
Kim's Channel: youtube.com/channel/UCvyfozDsB8VVQyVs66Pu9ng
Patreon: patreon.com/thesecondempirestrikesback
Instagram: instagram.com/the_2nd_empire_strikes_back
Tiktok: tiktok.com/@the2ndempirestrikesback
For Business Inquiries please email us at the2ndempirestrikesback@gmail.com
P.O. Box
The 2nd Empire Strikes Back
PO Box 2601
St Louis, MO 63116
Campbell House: campbellhousemuseum.org
^^^Seriously if you visit St. Louis and love all things Victorian go here^^^
Music: bensound.com/royalty-free-music
Completed Projects (2021): New Roof, New Water Service, New Windows (Partial), Boiler Work, Sewer Lateral, Tuckpointing, Plaster Repair (Partial), Wood Floors (Partial), Electric Service (Partial)
Projects to Complete in 2022: Limestone Restoration of Front Elevation, Rebuild Mansard, New Windows (Partial), Complete Plaster Work (2nd Floor and Back Hallway 1st Floor, Kitchen and Dining Room), Plumbing Stacks and Rough in Plumbing, Complete Electric, HVAC (Basement and 1st Floor), High Velocity AC and Heat (2nd Floor), Mini Splits (3rd Floor), Framing on 3rd Floor, Rebuild of Front Cornice Work and Copper Gutter System, Rebuilding of Dormers
Projects to Complete in 2023: Hallways and Stairwells (Plaster Repair, Floors, Stringers of Stairwell Reinforment), Completion of Windows (1st and 3rd Floors), Parlors (Including Fireplace Mantels, and Pocket Doors, and Decorative Fretwork, Completion of 3 Floor Bathroom and Main Suite