Uploaded May 2025 | Updated November 2026, 12 hours ago
HS2 engineers have completed the UK’s heaviest bridge slide.
The huge box – which weighs around the same as two new Royal Navy destroyers – is the heaviest of its kind in Europe. It will allow high-speed trains between London and Birmingham to pass under the dual carriageway on their approach to the new Interchange station near the NEC.
It is one of more than 200 major bridges and viaducts on the new railway, which is designed to improve journeys between London, the West Midlands and the north, while freeing up space on the existing mainline for more freight and local services.
HS2’s designers opted for a box structure, that could be built alongside the road and slid into place in one operation to avoid two years’ worth of speed restrictions and lane closures that would have been necessary to build a more traditional bridge design.
The complex three-part operation was delivered duing a planned 18-day closure of the busy A46 Kenilworth Bypass in Warwickshire. It was led by HS2’s main works contractor, BBV – a team made up of Balfour Beatty and VINCI – working closely with @NationalHighways and timed to coincide with lighter traffic during the school Easter holidays.
The first stage involved the demolition of a 200m long section of the old road and the excavation of around 35,000 cubic metres of material to make space for the box to be pushed into place. This material – mostly earth and sandstone – was stockpiled on site for reuse later.
The second stage involved pushing the 42m wide structure into position. This was achieved over 10 hours. Specialist engineers used an innovative @freyssinetuk7741 jacking mechanism called Autoripage, designed by specialist civil and structural engineering company Freyssinet, to push the box across on a guiding raft at an average speed of 6.5 metres per hour for a total distance of 64 metres.
Fifteen enormous jacks were used to guide the box into position, allowing engineers to gradually adjust the direction of travel with millimetre precision.
A series of holes in the base of the box allowed engineers to inject bentonite – a clay-based material – into the space between the box and the ground. This acted a lubrication to help ease the sliding operation.
During the final stage of the operation, the embankment which carries the road was carefully reconstructed, the new carriageway put into place and the road was reopened to traffic at around midnight on Tuesday 29 April, 2025 – 30 hours ahead of schedule.
📢 Subscribe for the latest news and updates from Britain’s high-speed railway, HS2.
Follow us on social media:
💼 X: twitter.com/HS2ltd
📸 Instagram: instagram.com/hs2ltd
📘 Facebook: facebook.com/HS2ltd
🔗 LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering
Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
📞 Call: 08081 434 434
📧 Email: hs2enquiries@hs2.org.uk
0:00 Intro
0:20 Why we built the bridge next to the road
1:05 Focus on the three-week closure of the A46
1:48 Week one of the closure
2:26 How we pushed the 14,500 box structure
4:19 Reassembling the road ready to re-open it
4:42 Reflecting on challenges across the project
5:03 Driving innovation and sharing best practise with the construction industry
5:52 Thank you to road users and local community
6:31 Outro
HS2 engineers have completed the UK’s heaviest bridge slide.
The huge box – which weighs around the same as two new Royal Navy destroyers – is the heaviest of its kind in Europe. It will allow high-speed trains between London and Birmingham to pass under the dual carriageway on their approach to the new Interchange station near the NEC.
It is one of more than 200 major bridges and viaducts on the new railway, which is designed to improve journeys between London, the West Midlands and the north, while freeing up space on the existing mainline for more freight and local services.
HS2’s designers opted for a box structure, that could be built alongside the road and slid into place in one operation to avoid two years’ worth of speed restrictions and lane closures that would have been necessary to build a more traditional bridge design.
The complex three-part operation was delivered duing a planned 18-day closure of the busy A46 Kenilworth Bypass in Warwickshire. It was led by HS2’s main works contractor, BBV – a team made up of Balfour Beatty and VINCI – working closely with @NationalHighways and timed to coincide with lighter traffic during the school Easter holidays.
The first stage involved the demolition of a 200m long section of the old road and the excavation of around 35,000 cubic metres of material to make space for the box to be pushed into place. This material – mostly earth and sandstone – was stockpiled on site for reuse later.
The second stage involved pushing the 42m wide structure into position. This was achieved over 10 hours. Specialist engineers used an innovative @freyssinetuk7741 jacking mechanism called Autoripage, designed by specialist civil and structural engineering company Freyssinet, to push the box across on a guiding raft at an average speed of 6.5 metres per hour for a total distance of 64 metres.
Fifteen enormous jacks were used to guide the box into position, allowing engineers to gradually adjust the direction of travel with millimetre precision.
A series of holes in the base of the box allowed engineers to inject bentonite – a clay-based material – into the space between the box and the ground. This acted a lubrication to help ease the sliding operation.
During the final stage of the operation, the embankment which carries the road was carefully reconstructed, the new carriageway put into place and the road was reopened to traffic at around midnight on Tuesday 29 April, 2025 – 30 hours ahead of schedule.
📢 Subscribe for the latest news and updates from Britain’s high-speed railway, HS2.
Follow us on social media:
💼 X: twitter.com/HS2ltd
📸 Instagram: instagram.com/hs2ltd
📘 Facebook: facebook.com/HS2ltd
🔗 LinkedIn: linkedin.com/company/high-speed-two-hs2-ltd
#HS2 #Train #Rail #Infrastructure #Construction #HighSpeedRail #Engineering
Get in touch: If you have any questions about HS2 or our ongoing works, contact our HS2 Helpdesk team:
📞 Call: 08081 434 434
📧 Email: hs2enquiries@hs2.org.uk
0:00 Intro
0:20 Why we built the bridge next to the road
1:05 Focus on the three-week closure of the A46
1:48 Week one of the closure
2:26 How we pushed the 14,500 box structure
4:19 Reassembling the road ready to re-open it
4:42 Reflecting on challenges across the project
5:03 Driving innovation and sharing best practise with the construction industry
5:52 Thank you to road users and local community
6:31 Outro









![First FPV drone flythrough of HS2’s Old Oak Common Station #shorts
Enjoy this unique FPV experience of flying through the huge box structure as engineers begin the next phase of construction 20 metres below ground, where six dedicated high speed platforms will be built, as well as the station building itself.
]Follow us on social media:
Twitter: https://twitter.com/HS2ltd
Instagram: https://www.instagram.com/hs2ltd/
Facebook: https://www.facebook.com/HS2ltd
LinkedIn: https://www.linkedin.com/company/high-speed-two-hs2-ltd/
#HS2 #Construction #dronevideo #fpvdrone #engineering #trainstation
If you have a question about HS2 or our works, please contact our HS2 Helpdesk team on 08081 434 434 or email hs2enquiries@hs2.org.uk. First FPV drone flythrough of HS2’s Old Oak Common Station #shorts](https://i.ytimg.com/vi/srgAdiotafw/mqdefault.jpg)
