How We Notched and Levelled the Posts for This Deck Frame @Buildtuff
How We Notched and Levelled the Posts for This Deck Frame  @Buildtuff
Uploaded April 2026 | Updated September 2026, 3 weeks ago
There is more than one way to notch a post, but for this build we used a mitre saw because that is what was available on site.

After marking where the joist would sit, multiple cuts were made to the depth of the joist before cleaning out the notch with a hammer and chisel. One screw was used to temporarily hold the joist in place while the opposite side was adjusted to find the correct height and keep the frame level.

Once everything was lined up, the second post was cut to size and the frame could start coming together. Sometimes the small details make all the difference in getting a stronger, straighter deck frame.

#buildtuff #tuffblock #deckbuild #deckframing #deckfoundation #diydeck #carpentry #backyardrenovation #deckblocks #outdoorliving
How We Notched and Levelled the Posts for This Deck FrameTransforming My Patio With TuffBlock Deck Blocks #deckbuilding #landscapedesign #diyhomedecorWhy TuffBlock Weighs 96% Less Than a Concrete Deck FootingUsing Notched 4x4s For Shed Foundations (correctly)Why TuffBlock Foundations Are Lighter Than Concrete (And Faster to Build)Simple & Affordable Ground Level Deck | Rivkas DIY Story #diy #landscaping #deckBiggest Challenges on Building on Uneven GroundShed Builders Review of Deck BlocksMost floating decks under 1 metre dont need council approval in Australia — but the rules vary by sHow To Trim Deck Boards And Install Fascia (For A Ground Deck)  #diy #deckbuilding #landscapedesignWhy We Notched the Posts Instead of Just Screwing Into ThemBuilding a Deck on Uneven Ground (No Concrete, 3-Day Build)
BuildTuff |

How We Notched and Levelled the Posts for This Deck Frame

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER