Uploaded November 2021 | Updated November 2026, 1 day ago
Check out this step-by-step DIY cooler stand project to elevate your drink game—literally and figuratively. Find more DIY project plans at yellawood.com/diy-projects/.
00:25 Grab 2x4 and head to the chopsaw / supplies list
Supplies: (1) 2x4, wood glue, sander, drill, chisel, table saw, wood clamps
0:31 Step One: Cut wood to size
Use saw to cut (2) 25” long cuts for legs
Cute (1) 20” long piece for arms
Cut (2) 6” long cuts
0:44 Cut all the pieces in half with a table saw
0:54 Remove stock edge with table saw
1:03 Step Two: Sanding
Sand pieces
1:26 Step Three: Cut arm angles
Lay out arm
Find a working angle
Cut to angle
1:41 Step Four: Cut joints
Cut Tenon joints
Cut Mortise joints
2:46 Step Five: Cut corresponding joints
Cut Tenons
Cut arm bases
3:22 Step Six: Make notches
Measure and mark notches
Cut out notches
4:00 Step Seven: Assemble legs
Pick an angle for legs and cut
Cut Tenons & Mortise joints
4:32 Step Seven (continued)
Use a drill and chisel for a clean joint
Attach legs to base with glue
Clamp and let dry
5:03 Step Eight: Sand and assemble
Sand pieces
Glue pieces together and let dry
5:38 Step Nine: Stain
Check out this step-by-step DIY cooler stand project to elevate your drink game—literally and figuratively. Find more DIY project plans at yellawood.com/diy-projects/.
00:25 Grab 2x4 and head to the chopsaw / supplies list
Supplies: (1) 2x4, wood glue, sander, drill, chisel, table saw, wood clamps
0:31 Step One: Cut wood to size
Use saw to cut (2) 25” long cuts for legs
Cute (1) 20” long piece for arms
Cut (2) 6” long cuts
0:44 Cut all the pieces in half with a table saw
0:54 Remove stock edge with table saw
1:03 Step Two: Sanding
Sand pieces
1:26 Step Three: Cut arm angles
Lay out arm
Find a working angle
Cut to angle
1:41 Step Four: Cut joints
Cut Tenon joints
Cut Mortise joints
2:46 Step Five: Cut corresponding joints
Cut Tenons
Cut arm bases
3:22 Step Six: Make notches
Measure and mark notches
Cut out notches
4:00 Step Seven: Assemble legs
Pick an angle for legs and cut
Cut Tenons & Mortise joints
4:32 Step Seven (continued)
Use a drill and chisel for a clean joint
Attach legs to base with glue
Clamp and let dry
5:03 Step Eight: Sand and assemble
Sand pieces
Glue pieces together and let dry
5:38 Step Nine: Stain










