Uploaded March 2026 | Updated November 2026, 22 hours ago
Step inside the CLAAS factory in Austria and watch how SCORPION telescopic handlers are built from the bare chassis to the finished machine.
This factory documentary shows the real production process step by step — including frame wiring, drivetrain and hydraulic installation, engine module assembly, cooling and exhaust systems, cab build-up, boom installation, wheel fitting, first engine start, testing, light tunnel inspection, and final loading for delivery.
You will see how the engine, radiator, and exhaust are combined into a complete power module, how the fully assembled cab is mounted onto the chassis, and how the boom, lighting, mudguards, mirrors, hitch, and wheels complete the machine before final quality checks.
If you enjoy “how it’s made” videos, factory tours, heavy machinery, agricultural engineering, and industrial assembly processes, this video is for you.
👍 If you like this kind of content, please subscribe and leave a comment with the part of the process you found most interesting.
⏱️ Chapters:
0:00 Intro
0:32 Frame Wiring Installation
0:48 Axle, Drivetrain & Hydraulic Installation
2:05 Building the Engine Module
2:45 ❄️ Cooling Module Assembly
5:39 Installing the Cooling Module into the Engine Basket
6:00 Building the SCR Exhaust Module
7:45 Installing Exhaust Module to the Engine Basket
8:09 Finalizing the Engine Power Basket
(Combining the motor, radiator, and exhaust into a single mechanism in a special basket.)
8:48 Bell Housing and Axial Piston Pump Assembly
11:01 Flywheel Housing Interface to the Power Basket
11:21 Installing the Engine Module into the Chassis
12:35 Preparing and Installing the Hood
13:06 Right-Side Access Platform Installation
13:35 Cab Assembly Begins and Mirror Installation
14:05 Installing the Roof Liner and Overhead Console
14:29 Mounting the Air-Suspension Seat
15:05 Dashboard and Steering Column Installation
15:29 Steering Wheel Installation
16:00 Wiper Drive Installation
16:08 Cab Exterior Is Cleaned
16:25 Cab-to-Chassis Marriage
(Mounting the fully assembled cabin onto the frame.)
16:55 Boom-to-Chassis Marriage
18:27 Rear and Front Lighting Installation
19:10 Front and Rear Mudguard Installation
19:32 Rear Mirror Mast Installation
19:58 Rear Jaw Hitch Installation
20:40 🛞 Wheels Installation Station
22:41 Scorpion 638 at the Transport Platform Positioning
23:03 SCORPION 742 Night Edition to the Fluid Fill Station
23:26 Final Fluid Filling and System Preparation
24:16 First Start and Functional Testing
(Boom, Steering and Drivetrain Test)
26:28 Headlight Adjustment Station
26:58 Light Tunnel Inspection
27:40 Final Loading and 🚛 Delivery
#CLAAS #HowItsMade #FactoryTour #Manufacturing #Telehandler #SCORPION #HeavyMachinery #Austria
Step inside the CLAAS factory in Austria and watch how SCORPION telescopic handlers are built from the bare chassis to the finished machine.
This factory documentary shows the real production process step by step — including frame wiring, drivetrain and hydraulic installation, engine module assembly, cooling and exhaust systems, cab build-up, boom installation, wheel fitting, first engine start, testing, light tunnel inspection, and final loading for delivery.
You will see how the engine, radiator, and exhaust are combined into a complete power module, how the fully assembled cab is mounted onto the chassis, and how the boom, lighting, mudguards, mirrors, hitch, and wheels complete the machine before final quality checks.
If you enjoy “how it’s made” videos, factory tours, heavy machinery, agricultural engineering, and industrial assembly processes, this video is for you.
👍 If you like this kind of content, please subscribe and leave a comment with the part of the process you found most interesting.
⏱️ Chapters:
0:00 Intro
0:32 Frame Wiring Installation
0:48 Axle, Drivetrain & Hydraulic Installation
2:05 Building the Engine Module
2:45 ❄️ Cooling Module Assembly
5:39 Installing the Cooling Module into the Engine Basket
6:00 Building the SCR Exhaust Module
7:45 Installing Exhaust Module to the Engine Basket
8:09 Finalizing the Engine Power Basket
(Combining the motor, radiator, and exhaust into a single mechanism in a special basket.)
8:48 Bell Housing and Axial Piston Pump Assembly
11:01 Flywheel Housing Interface to the Power Basket
11:21 Installing the Engine Module into the Chassis
12:35 Preparing and Installing the Hood
13:06 Right-Side Access Platform Installation
13:35 Cab Assembly Begins and Mirror Installation
14:05 Installing the Roof Liner and Overhead Console
14:29 Mounting the Air-Suspension Seat
15:05 Dashboard and Steering Column Installation
15:29 Steering Wheel Installation
16:00 Wiper Drive Installation
16:08 Cab Exterior Is Cleaned
16:25 Cab-to-Chassis Marriage
(Mounting the fully assembled cabin onto the frame.)
16:55 Boom-to-Chassis Marriage
18:27 Rear and Front Lighting Installation
19:10 Front and Rear Mudguard Installation
19:32 Rear Mirror Mast Installation
19:58 Rear Jaw Hitch Installation
20:40 🛞 Wheels Installation Station
22:41 Scorpion 638 at the Transport Platform Positioning
23:03 SCORPION 742 Night Edition to the Fluid Fill Station
23:26 Final Fluid Filling and System Preparation
24:16 First Start and Functional Testing
(Boom, Steering and Drivetrain Test)
26:28 Headlight Adjustment Station
26:58 Light Tunnel Inspection
27:40 Final Loading and 🚛 Delivery