The manufacturing process of telescopic boom crawler cranes at the Tadano Mantis Corporation Plant in the United States is a highly specialized and precision-driven operation. Located in Franklin, Tennessee, the Tadano Mantis plant focuses on producing high-performance telescopic boom crawler cranes, which are widely used in industries like construction, energy, and infrastructure.
The Tadano Mantis Corporation prides itself on manufacturing high-quality telescopic boom crawler cranes that provide versatility, durability, and safety for users worldwide. Their cranes are widely recognized for their advanced hydraulic systems and ability to operate in challenging environments.
0:00 About Tadano Mantis
0:09 Welding shop
2:10 Machining
2:40 Painting
3:07 Telescopic boom production
5:12 Undercarriage assembling
5:45 Superstructure assembling
6:33 Undercarriage to superstructure marriage
7:17 Cab installing
8:53 Test Area
Inside the Factory: How Tadano Mantis Builds Telescopic Boom Crawler Cranes in the USA?
The manufacturing process of telescopic boom crawler cranes at the Tadano Mantis Corporation Plant in the United States is a highly specialized and precision-driven operation. Located in Franklin, Tennessee, the Tadano Mantis plant focuses on producing high-performance telescopic boom crawler cranes, which are widely used in industries like construction, energy, and infrastructure.
The Tadano Mantis Corporation prides itself on manufacturing high-quality telescopic boom crawler cranes that provide versatility, durability, and safety for users worldwide. Their cranes are widely recognized for their advanced hydraulic systems and ability to operate in challenging environments.
0:00 About Tadano Mantis
0:09 Welding shop
2:10 Machining
2:40 Painting
3:07 Telescopic boom production
5:12 Undercarriage assembling
5:45 Superstructure assembling
6:33 Undercarriage to superstructure marriage
7:17 Cab installing
8:53 Test Area