Use 5" slump concrete for the footing and first block.
Begin placement under openings and stepped footings to allow these areas to go 'off' first.
Use a pencil vibrator to consolidate footing. Do not over vibrate as this will force any concrete in wall to 'blow-up" the footing bag.
Fill footing in direction of fabric overlap (counter clockwise) to prevent concrete leaking between overlap.
IMPORTANT: Allow sufficient time for the footing concrete to go 'off' so that subsequent lifts do not increase hydraulic load in fabric. Kick the bag, or 'sound the concrete' to confirm stiffness.
Never use a retarder in the footing concrete. In winter, use a 2-1/2" slump mix and add a plasticizer to achieve flow. Continue filling wall when the slump has returned to 2-1/2".
Check wall alignment against string lines during the pour.
Fastfoot® Monopour Concrete PlacementFastfoot® Monopour: Econ Group ConstructionFastfoot™ Footings | This Concrete Form Never Leaks #diy #building #concrete #fastfootworkThe Simplest Way to Level ICF Blocks |  Zeveler™ #icf #foam #builder #construction #levelHow to brace 32 ICF Walls, and 110 yards of ConcreteHow to build concrete footingsFastfoot® Commercial Footings - KitimatFast-Tube™ - Mexico MissionsZont™ Insulated Concrete Form Bracing - SED Construction TimelapseWhy Your Footing Fails (FastFoot Fix) #shortsMonster Concrete Pads Formed with Just 2x4s and Fastfoot  #Shorts #padNicaragua Church: Fast-Tube® Columns
Fab-Form Industries |

Fastfoot® Monopour Concrete Placement

SHARE TO X SHARE TO REDDIT SHARE TO FACEBOOK WALLPAPER